About 65% of the works are currently completed!

The rehabilitation of Neighborhoods 4, 5 and 6 includes the entire area of buildings and individual dwellings (villas 2-3 floors).This project aims to fulfill the rehabilitation of infrastructure in its entirety, including the urbanization of neighborhoods no. 4, 5, 6, the architecture of existing facilities, road infrastructure, lighting, greenery, as well as underground infrastructure, sewage, electricity, telephone, internet and television network.

The intervention by the ADF with the support of the Albanian Government is in the process of implementation for the rehabilitation of roads, public spaces between buildings, in accordance with the architectural nature of each building but also with their unification and connection with the urban development of the area.

 

Compared to the previous situation, the need arose to reorganize the territory to be used for highways, pedestrian roads, green rest areas. The road will have a traffic lane and sidewalks on both sides. Road layers have been calculated and treated in such a way as to provide road guarantees, sustainability and meet actual and prospective capacities.

Despite the parking on the inner streets of the neighborhood was considered the possibility of building parking lots inside the block with 2.5 ÷ 4 m width.

The project also foresees the implementation of the component of low and high greenery.