{"id":9348,"date":"2021-04-22T10:19:57","date_gmt":"2021-04-22T08:19:57","guid":{"rendered":"https:\/\/www.albaniandf.org\/?p=9348"},"modified":"2021-04-22T10:19:57","modified_gmt":"2021-04-22T08:19:57","slug":"construction-of-bridge-no-2-km-7500-fier-seman-road","status":"publish","type":"post","link":"https:\/\/www.albaniandf.org\/en\/2021\/04\/22\/construction-of-bridge-no-2-km-7500-fier-seman-road\/","title":{"rendered":"Construction of bridge no. 2, km 7+500, Fier \u2013 Seman Road"},"content":{"rendered":"<p><strong>SPECIFIC PROCUREMENT NOTICE<\/strong><\/p>\n<p><strong>REQUEST FOR BIDS<\/strong><\/p>\n<p><strong>Small Works<\/strong><\/p>\n<p><strong>(One-Envelope Bidding Process)<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Employer<\/strong><strong>: <\/strong>Albanian Development Fund (ADF)<\/p>\n<p><strong>Project: <\/strong>Regional and Local Roads Connectivity Project (RLRCP)<\/p>\n<p><strong>Contract title<\/strong><strong>: <\/strong>\u201cConstruction of bridge no. 2, km 7+500, Fier \u2013 Seman Road\u201d<\/p>\n<p><strong>Country: <\/strong>Albania<\/p>\n<p><strong>Loan No.:<\/strong> IBRD loan 8850-AL<\/p>\n<p><strong>RFB No: <\/strong>RLRCP\/1\/1.13\/2021<\/p>\n<p><strong>Issued on: <\/strong>April 22, 2021<\/p>\n<p>&nbsp;<\/p>\n<ol>\n<li>The Government of Albania has received financing from the World Bank toward the cost of the Regional and Local Roads Connectivity Project (RLRCP), and intends to apply part of the proceeds toward payments under the following contract.<\/li>\n<\/ol>\n<p><strong>Albanian Development Fund (ADF) <\/strong>is the Project Implementing Agency for the \u201cRegional and Local Roads Connectivity Project (RLRCP)\u201d Project.<\/p>\n<ol start=\"2\">\n<li>ADF now invites sealed Bids from eligible Bidders for:<\/li>\n<\/ol>\n<p><strong>RLRCP\/1\/1.13\/2021, \u201cConstruction of bridge no. 2, km 7+500, Fier \u2013 Seman Road\u201d<\/strong>. The construction period is 6 months. This project lies in the central-southern area of Albania. The bridge is located in the segment Fier Seman Road and it is in the cross point of Seman and Darezeze village. There is actually an existing bridge crossing the big irrigation channel. The technical parameters of the bridge are not good, as the width is reduced and is a one lane bridge.<\/p>\n<p>The Project consists of the construction of a new two span bridge, with two abutments and a central pillar. The beams will be tensioned. The geometry lay of the bridge will be parallel with the existing two segments which will facilitate the traffic and reduce hazardous traveling. The width of the bridge will be for two lanes in way to anticipate<\/p>\n<ol start=\"3\">\n<li>Bidding will be conducted through international competitive procurement using Request for Bids (RFB), Small Works (One-Envelope Bidding Process) as specified in the World Bank\u2019s \u201cProcurement Regulations for IPF Borrowers\u201d July 2016 (\u201cProcurement Regulations\u201d), and is open to all eligible Bidders as defined in the Procurement Regulations.<\/li>\n<li>Interested eligible Bidders may obtain further information and inspect the bidding document during office hours 10:00 to 14:00 hours at the address given below.<\/li>\n<li>The bidding document in English may be purchased by interested eligible Bidders upon the submission of a written application to the address below and upon payment of a nonrefundable fee of 200 Euro. The method of payment will be direct deposit to the ADF account, at Union Bank, as follows:<\/li>\n<\/ol>\n<p>Name of the Bank: UNION BANK \u2013Tirana, Albania<\/p>\n<p>Name of account: \u201cLlogari Projekti ADF\u201d<\/p>\n<p>IBAN CODE: AL47 2141 1106 0117 2854 6403 0120<\/p>\n<p>Client number: 285464<\/p>\n<p>The document will be sent by e-mail or dispatched.<\/p>\n<p>For the direct deposit, the Bidder should provide Bank\u2019 payment receipt to ADF. Upon receipt of appropriate evidence of payment of the non-refundable fee, the documents will promptly be dispatched. In addition, if requested, the documents can be dispatched electronically after presentation by the prospective tenderer of an appropriate evidence of payment of the non-refundable fee. In the event of discrepancy between electronic and hard copies of the documents, the hard copy shall prevail.<\/p>\n<ol start=\"6\">\n<li>Bids must be delivered to the address below on or before <strong>June 03, 2021, 11:00 hrs<\/strong><em>.<\/em> Electronic bidding will not be permitted. Late Bids will be rejected. Bids will be immediately publicly opened in the presence of the Bidders\u2019 designated representatives and anyone who chooses to attend, at the address below.<\/li>\n<li>All Bids must be accompanied by a bid security in the amount of 45,200 US$, or its equivalent in a convertible currency (using the Bank of Albania official exchange rate on the date of publication of the Specific Procurement Notice.<\/li>\n<li>Attention is drawn to the Procurement Regulations requiring the Borrower to disclose information on the successful bidder\u2019s beneficial ownership, as part of the Contract Award Notice, using the Beneficial Ownership Disclosure Form as included in the bidding document.\u201d<\/li>\n<li>The addresses referred to above are:<\/li>\n<\/ol>\n<p>For further information and inspection of the bid document:<\/p>\n<p>Albanian Development Fund<\/p>\n<p>Address: Rr. \u201cSami Frasheri\u201d, Nr. 10, Tirana, Albania<\/p>\n<p>Contact name: Ms. Manjola Dhamo<\/p>\n<p>Second Floor<\/p>\n<p>Tel : +355 4 22 35 597\/8<\/p>\n<p>Fax : +355 4 22 28 548<\/p>\n<p>E-mail : <a href=\"mailto:adf@albaniandf.org\">adf@albaniandf.org<\/a>; <a href=\"mailto:mdhamo@albaniandf.org\">mdhamo@albaniandf.org<\/a><\/p>\n<p>Web site : <a href=\"https:\/\/www.albaniandf.org\/en\/\">www.albaniandf.org<\/a><\/p>\n<p>&nbsp;<\/p>\n<p>For Bid submission:<\/p>\n<p>Albanian Development Fund<\/p>\n<p>Street Address: Rr. Sami Frasheri, No. 10<\/p>\n<p>Room number: Protocol Office<\/p>\n<p>City: Tirana<\/p>\n<p>Country: Albania<\/p>\n<p>&nbsp;<\/p>\n<p>For Bid opening:<\/p>\n<p>Albanian Development Fund<\/p>\n<p>Street Address: Rr. Sami Frasheri, No. 10<\/p>\n<p>Floor\/Room number: Fourth Floor.<\/p>\n<p>City: Tirana<\/p>\n<p>Country: Albania<\/p>","protected":false},"excerpt":{"rendered":"<p>SPECIFIC PROCUREMENT NOTICE REQUEST FOR BIDS Small Works (One-Envelope Bidding Process) &nbsp; Employer: Albanian Development Fund (ADF) Project: Regional and Local Roads Connectivity Project (RLRCP) Contract title: \u201cConstruction of bridge&#8230;<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"nf_dc_page":"","footnotes":""},"categories":[50,54],"tags":[],"class_list":["post-9348","post","type-post","status-publish","format-standard","hentry","category-prokurime","category-punime_civile"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction of bridge no. 2, km 7+500, Fier \u2013 Seman Road - Fondi Shqiptar i Zhvillimit<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.albaniandf.org\/en\/2021\/04\/22\/construction-of-bridge-no-2-km-7500-fier-seman-road\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction of bridge no. 2, km 7+500, Fier \u2013 Seman Road - Fondi Shqiptar i Zhvillimit\" \/>\n<meta property=\"og:description\" content=\"SPECIFIC PROCUREMENT NOTICE REQUEST FOR BIDS Small Works (One-Envelope Bidding Process) &nbsp; Employer: Albanian Development Fund (ADF) Project: Regional and Local Roads Connectivity Project (RLRCP) Contract title: \u201cConstruction of bridge...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.albaniandf.org\/en\/2021\/04\/22\/construction-of-bridge-no-2-km-7500-fier-seman-road\/\" \/>\n<meta property=\"og:site_name\" content=\"Fondi Shqiptar i Zhvillimit\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/albaniandf\/\" \/>\n<meta property=\"article:published_time\" content=\"2021-04-22T08:19:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/i0.wp.com\/www.albaniandf.org\/wp-content\/uploads\/2021\/09\/Fondi-Shqiptar-i-zhvillimit-logo-original.png?fit=623%2C452&ssl=1\" \/>\n\t<meta property=\"og:image:width\" content=\"623\" \/>\n\t<meta property=\"og:image:height\" content=\"452\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"admin-admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin-admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/en\\\/2021\\\/04\\\/22\\\/construction-of-bridge-no-2-km-7500-fier-seman-road\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/en\\\/2021\\\/04\\\/22\\\/construction-of-bridge-no-2-km-7500-fier-seman-road\\\/\"},\"author\":{\"name\":\"admin-admin\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#\\\/schema\\\/person\\\/5aded91f028ee21c8f01a1301b6a4352\"},\"headline\":\"Construction of bridge no. 2, km 7+500, Fier \u2013 Seman Road\",\"datePublished\":\"2021-04-22T08:19:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/en\\\/2021\\\/04\\\/22\\\/construction-of-bridge-no-2-km-7500-fier-seman-road\\\/\"},\"wordCount\":693,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#organization\"},\"articleSection\":[\"Prokurime\",\"Punime Civile\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.albaniandf.org\\\/en\\\/2021\\\/04\\\/22\\\/construction-of-bridge-no-2-km-7500-fier-seman-road\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/en\\\/2021\\\/04\\\/22\\\/construction-of-bridge-no-2-km-7500-fier-seman-road\\\/\",\"url\":\"https:\\\/\\\/www.albaniandf.org\\\/en\\\/2021\\\/04\\\/22\\\/construction-of-bridge-no-2-km-7500-fier-seman-road\\\/\",\"name\":\"Construction of bridge no. 2, km 7+500, Fier \u2013 Seman Road - Fondi Shqiptar i Zhvillimit\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#website\"},\"datePublished\":\"2021-04-22T08:19:57+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/en\\\/2021\\\/04\\\/22\\\/construction-of-bridge-no-2-km-7500-fier-seman-road\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.albaniandf.org\\\/en\\\/2021\\\/04\\\/22\\\/construction-of-bridge-no-2-km-7500-fier-seman-road\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/en\\\/2021\\\/04\\\/22\\\/construction-of-bridge-no-2-km-7500-fier-seman-road\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.albaniandf.org\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction of bridge no. 2, km 7+500, Fier \u2013 Seman Road\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#website\",\"url\":\"https:\\\/\\\/www.albaniandf.org\\\/\",\"name\":\"Fondi Shqiptar i Zhvillimit\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.albaniandf.org\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#organization\",\"name\":\"Fondi Shqiptar i Zhvillimit\",\"url\":\"https:\\\/\\\/www.albaniandf.org\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.albaniandf.org\\\/wp-content\\\/uploads\\\/2021\\\/08\\\/Fondi-Shqiptar-i-zhvillimit-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.albaniandf.org\\\/wp-content\\\/uploads\\\/2021\\\/08\\\/Fondi-Shqiptar-i-zhvillimit-logo.png\",\"width\":122,\"height\":90,\"caption\":\"Fondi Shqiptar i Zhvillimit\"},\"image\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/albaniandf\\\/\",\"https:\\\/\\\/www.instagram.com\\\/fondi_shqiptar_i_zhvillimit\\\/\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/AlbanianDF\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#\\\/schema\\\/person\\\/5aded91f028ee21c8f01a1301b6a4352\",\"name\":\"admin-admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e39dd0b6e5d33b70cac88c6e9a5f8284419cfb4f9dace3380d3036a3ebb77903?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e39dd0b6e5d33b70cac88c6e9a5f8284419cfb4f9dace3380d3036a3ebb77903?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e39dd0b6e5d33b70cac88c6e9a5f8284419cfb4f9dace3380d3036a3ebb77903?s=96&d=mm&r=g\",\"caption\":\"admin-admin\"},\"url\":\"https:\\\/\\\/www.albaniandf.org\\\/en\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction of bridge no. 2, km 7+500, Fier \u2013 Seman Road - Fondi Shqiptar i Zhvillimit","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.albaniandf.org\/en\/2021\/04\/22\/construction-of-bridge-no-2-km-7500-fier-seman-road\/","og_locale":"en_US","og_type":"article","og_title":"Construction of bridge no. 2, km 7+500, Fier \u2013 Seman Road - Fondi Shqiptar i Zhvillimit","og_description":"SPECIFIC PROCUREMENT NOTICE REQUEST FOR BIDS Small Works (One-Envelope Bidding Process) &nbsp; Employer: Albanian Development Fund (ADF) Project: Regional and Local Roads Connectivity Project (RLRCP) Contract title: \u201cConstruction of bridge...","og_url":"https:\/\/www.albaniandf.org\/en\/2021\/04\/22\/construction-of-bridge-no-2-km-7500-fier-seman-road\/","og_site_name":"Fondi Shqiptar i Zhvillimit","article_publisher":"https:\/\/www.facebook.com\/albaniandf\/","article_published_time":"2021-04-22T08:19:57+00:00","og_image":[{"width":623,"height":452,"url":"https:\/\/i0.wp.com\/www.albaniandf.org\/wp-content\/uploads\/2021\/09\/Fondi-Shqiptar-i-zhvillimit-logo-original.png?fit=623%2C452&ssl=1","type":"image\/png"}],"author":"admin-admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin-admin","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.albaniandf.org\/en\/2021\/04\/22\/construction-of-bridge-no-2-km-7500-fier-seman-road\/#article","isPartOf":{"@id":"https:\/\/www.albaniandf.org\/en\/2021\/04\/22\/construction-of-bridge-no-2-km-7500-fier-seman-road\/"},"author":{"name":"admin-admin","@id":"https:\/\/www.albaniandf.org\/#\/schema\/person\/5aded91f028ee21c8f01a1301b6a4352"},"headline":"Construction of bridge no. 2, km 7+500, Fier \u2013 Seman Road","datePublished":"2021-04-22T08:19:57+00:00","mainEntityOfPage":{"@id":"https:\/\/www.albaniandf.org\/en\/2021\/04\/22\/construction-of-bridge-no-2-km-7500-fier-seman-road\/"},"wordCount":693,"commentCount":0,"publisher":{"@id":"https:\/\/www.albaniandf.org\/#organization"},"articleSection":["Prokurime","Punime Civile"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.albaniandf.org\/en\/2021\/04\/22\/construction-of-bridge-no-2-km-7500-fier-seman-road\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.albaniandf.org\/en\/2021\/04\/22\/construction-of-bridge-no-2-km-7500-fier-seman-road\/","url":"https:\/\/www.albaniandf.org\/en\/2021\/04\/22\/construction-of-bridge-no-2-km-7500-fier-seman-road\/","name":"Construction of bridge no. 2, km 7+500, Fier \u2013 Seman Road - Fondi Shqiptar i Zhvillimit","isPartOf":{"@id":"https:\/\/www.albaniandf.org\/#website"},"datePublished":"2021-04-22T08:19:57+00:00","breadcrumb":{"@id":"https:\/\/www.albaniandf.org\/en\/2021\/04\/22\/construction-of-bridge-no-2-km-7500-fier-seman-road\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.albaniandf.org\/en\/2021\/04\/22\/construction-of-bridge-no-2-km-7500-fier-seman-road\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.albaniandf.org\/en\/2021\/04\/22\/construction-of-bridge-no-2-km-7500-fier-seman-road\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.albaniandf.org\/"},{"@type":"ListItem","position":2,"name":"Construction of bridge no. 2, km 7+500, Fier \u2013 Seman Road"}]},{"@type":"WebSite","@id":"https:\/\/www.albaniandf.org\/#website","url":"https:\/\/www.albaniandf.org\/","name":"Albanian Development Fund","description":"","publisher":{"@id":"https:\/\/www.albaniandf.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.albaniandf.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.albaniandf.org\/#organization","name":"Albanian Development Fund","url":"https:\/\/www.albaniandf.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.albaniandf.org\/#\/schema\/logo\/image\/","url":"https:\/\/www.albaniandf.org\/wp-content\/uploads\/2021\/08\/Fondi-Shqiptar-i-zhvillimit-logo.png","contentUrl":"https:\/\/www.albaniandf.org\/wp-content\/uploads\/2021\/08\/Fondi-Shqiptar-i-zhvillimit-logo.png","width":122,"height":90,"caption":"Fondi Shqiptar i Zhvillimit"},"image":{"@id":"https:\/\/www.albaniandf.org\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/albaniandf\/","https:\/\/www.instagram.com\/fondi_shqiptar_i_zhvillimit\/","https:\/\/www.youtube.com\/user\/AlbanianDF"]},{"@type":"Person","@id":"https:\/\/www.albaniandf.org\/#\/schema\/person\/5aded91f028ee21c8f01a1301b6a4352","name":"admin-admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/e39dd0b6e5d33b70cac88c6e9a5f8284419cfb4f9dace3380d3036a3ebb77903?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e39dd0b6e5d33b70cac88c6e9a5f8284419cfb4f9dace3380d3036a3ebb77903?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e39dd0b6e5d33b70cac88c6e9a5f8284419cfb4f9dace3380d3036a3ebb77903?s=96&d=mm&r=g","caption":"admin-admin"},"url":"https:\/\/www.albaniandf.org\/en\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/posts\/9348","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/comments?post=9348"}],"version-history":[{"count":1,"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/posts\/9348\/revisions"}],"predecessor-version":[{"id":9349,"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/posts\/9348\/revisions\/9349"}],"wp:attachment":[{"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/media?parent=9348"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/categories?post=9348"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/tags?post=9348"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}