{"id":6405,"date":"2019-10-08T17:04:21","date_gmt":"2019-10-08T15:04:21","guid":{"rendered":"https:\/\/www.albaniandf.org\/?p=6405"},"modified":"2019-10-08T17:04:21","modified_gmt":"2019-10-08T15:04:21","slug":"construction-of-emergency-center-palase-rehabilitation-of-the-torrent-and-parking-area-in-dhermi-village-3","status":"publish","type":"post","link":"https:\/\/www.albaniandf.org\/en\/2019\/10\/08\/construction-of-emergency-center-palase-rehabilitation-of-the-torrent-and-parking-area-in-dhermi-village-3\/","title":{"rendered":"Construction of emergency center Palase, rehabilitation of the torrent and parking area in Dhermi village"},"content":{"rendered":"<p><strong>CONTRACT AWARD NOTICE <\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Employer<\/strong><strong>: <\/strong>Albanian Development Fund (ADF)<\/p>\n<p><strong>Project: <\/strong>Community Works IV: Development of the Albanian Alps and Coastal Areas<\/p>\n<p><strong>Contract title<\/strong><strong>: <\/strong>\u201cConstruction of emergency center Palase, rehabilitation of the torrent and parking area in Dhermi village\u201d<\/p>\n<p><strong>Country: <\/strong>Albania<\/p>\n<p><strong>Loan No.:<\/strong> ALB &#8211; LD 1853<\/p>\n<p><strong>RFB No: <\/strong>CWPIV\/W\/OP\/2019\/20<\/p>\n<p><strong>Issued on: <\/strong>October 08, 2019<\/p>\n<p>&nbsp;<\/p>\n<p><strong>I.\u00a0 The duration and summary scope of the contract: <\/strong>The construction period is 10 months. The project includes these sub-projects:<\/p>\n<ul>\n<li>Multifunctional Emergency Service Center<\/li>\n<li>Parking area<\/li>\n<li>Point view<\/li>\n<\/ul>\n<p>The service center is located near the beach of Palase, along the main road to the shore.<\/p>\n<p>This center will include civil emergency functions such as health centers, police stations, fire brigades, border posts and helicopter landing place. The purpose of this center is to serve the citizens and tourists of the Ionian coast mainly during the tourist season for any emergencies and occasions. This emergency center will serve to all the beach areas along Palase, Dhermi village, Drimadhe and Dhermi beach and other touristic sites located in the zone.<\/p>\n<p>The center is designed along the beach edge for faster access. Every service in the center has its own building. And all the buildings have a common square. This square serves as landing area or platform for helicopters. Works will include concrete works, infrastructure works, masonry, plastering electric etc.<\/p>\n<p>The architecture of the center and the objects in particular respects the terrain by having a clean approach and integrating with nature.<\/p>\n<p>View point is located in the nation road Vlora \u2013 Himare, between Gjileke neighborhoods and Dhermi Village. This are foreseeing the rehabilitation of the landscape which actually is in very poor conditions due to the debris left over after the demolition process of informal constructions. The area will be transformed in a recreative place in line with the other intervention in the zone.<\/p>\n<p>The next spot is the parking area. This are foreseeing the rehabilitation of the old quarry on the right side of the road Vlore \u2013 Himare just after Dhermi village. This area will be transformed in a public parking which will serve to tourists and habitants of the lately reconstructed village. The works to be executed are excavations, gabion walls, gravel layers and greenage works.<\/p>\n<p>The Site is located at Himara municipality.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>II.\u00a0 The selection method used:<\/strong> The Most Advantageous Bid.<\/p>\n<p><strong>III.\u00a0 The Bidder <\/strong><strong>submitting the successful Bid: <\/strong>\u201cGjikuria\u201d shpk.<\/p>\n<p><strong>IV.\u00a0 T<\/strong><strong>he Contract price of the successful Bid: <\/strong>93,897,546 ALL (net of VAT) \u2013 112,277,815 ALL (VAT included).<\/p>\n<p><strong>V.\u00a0 The Bidders who submitted a Bid:<\/strong><\/p>\n<ol>\n<li>\u201cGjikuria\u201d shpk<\/li>\n<li>JV \u201cLeon Konstruksion\u201d shpk &amp; \u201cLlazo\u201d shpk<\/li>\n<li>\u201cArifaj\u201d shpk<\/li>\n<\/ol>\n<p>&nbsp;<\/p>\n<p><strong>VI.\u00a0 The bid prices as read out at opening<\/strong><strong> of financial <\/strong><strong>parts of bids<\/strong><strong>:<\/strong><\/p>\n<p>1. \u201cGjikuria\u201d shpk &#8211; 93,897,546 ALL (net of VAT) \u2013 112,277,815 ALL (VAT included).<\/p>\n<p>&nbsp;<\/p>\n<p><strong>VII.\u00a0 The bid prices as evaluated:<\/strong><\/p>\n<p>1. \u201cGjikuria\u201d shpk &#8211; 93,897,546 ALL (net of VAT) \u2013 112,277,815 ALL (VAT included).<\/p>\n<p><strong>VIII.\u00a0 The unsuccessful bidders and the reasons <\/strong><strong>the bids were <\/strong><strong>unsuccessful: <\/strong><\/p>\n<ol>\n<li><strong>JV \u201cLeon Konstruksion\u201d shpk &amp; \u201cLlazo\u201d shpk. <\/strong>The bid is not substantially responsive as follows:<\/li>\n<\/ol>\n<p>ITB 19.1. and 19.3. The Bid Validity Period shall be 91 days starting from the date of the deadline for Bid submission and shall be valid for twenty-eight (28) days beyond the original validity period of the Bid.<\/p>\n<p>The Bid Security submitted by the Bidder expires on December 10, 2019, which is an earlier date than the date specified on procurement documents.<\/p>\n<p>Bid Evaluation Committee didn\u2019t continue with further verifications.<\/p>\n<p>2.<strong> \u201cArifaj\u201d shpk<\/strong><\/p>\n<p>The bid does not meet the qualifying criteria, conforming to all the terms, conditions and specifications of the Bidding Documents as follows:<\/p>\n<p>4.2 (a)\u00a0 Specific Construction Experience. The criterion is not fulfilled. The bidder submitted the following contracts:<\/p>\n<ol>\n<li>Reconstruction of National Road \u2013 Iballe, lot 1 started on 3\/2013 and completed in 12\/2015. Value of the works is 480,563,277. The bidder is 60%participant in this contract.<\/li>\n<\/ol>\n<p>This contract cannot be taken in account as it is not similar with the requested one.<\/p>\n<ol start=\"2\">\n<li>Reconstruction of National Road \u2013 Iballe, lot 2 started on 5\/2014 and completed in 12\/2015. The value of the works is 356,878,885 ALL.<\/li>\n<\/ol>\n<p>This contract cannot be taken in account as it is not similar with the requested one.<\/p>\n<ol start=\"3\">\n<li>Reconstruction of promenade \u201cJosif Budo\u201d and \u201cIndrit Cara\u201d, reconstruction of the mosque square Kubelie, Kavaje started on 7\/2014 and completed on 6\/2015. The value of the works is 199,722,293 ALL. The bidder is 82 % participant.<\/li>\n<\/ol>\n<p>This contract cannot be taken in account as it is not\u00a0\u00a0\u00a0\u00a0\u00a0 similar with the requested one.<\/p>\n<ol start=\"4\">\n<li>Requalification of Central Urban Square in Kukes city started in 7\/2015 and completed on 6\/2016. The value of the works is 155,216,512 ALL.<\/li>\n<\/ol>\n<p>This contract cannot be taken in account as it is not\u00a0\u00a0\u00a0\u00a0\u00a0 similar with the requested one.<\/p>\n<ol start=\"5\">\n<li>Reconstruction of road Soda Forest started on 5\/2017 and completed on 12\/2018. The value of the works is 275,040,454 ALL.<\/li>\n<\/ol>\n<p>This contract cannot be taken in account as it is not\u00a0\u00a0\u00a0\u00a0\u00a0 similar with the requested one.<\/p>\n<ol start=\"6\">\n<li>Construction of Transballkanika road, phase 1 and 2 started on 3\/2016 and completed on 11\/2016. The value of the works is 141,697,174 ALL.<\/li>\n<\/ol>\n<p>This contract cannot be taken in account as it is not\u00a0\u00a0\u00a0\u00a0\u00a0 similar with the requested one.<\/p>\n<ol start=\"7\">\n<li>Urban Requalification of road \u2018Muhamet Gjollesha \u2013 Myslym Shyri, Kavaja road started on 6\/2016 and completed on 3\/2017. The value of the works is 105,142,355 ALL.<\/li>\n<\/ol>\n<p>This contract cannot be taken in account as it is not\u00a0\u00a0\u00a0\u00a0\u00a0 similar with the requested one.<\/p>\n<ol start=\"8\">\n<li>Rehabilitation of Saranda staircase started on 12\/2017 and completed on 12\/2018. The value of the works is 95,390,574 ALL.<\/li>\n<\/ol>\n<p>This contract cannot be taken in account as it is not\u00a0\u00a0\u00a0\u00a0\u00a0 similar with the requested one.<\/p>\n<ol start=\"9\">\n<li>Reconstruction of the Velipoja Road, Arch Berdice \u2013 Baks lot2 started on 6\/2017 and completed on 3\/2019.<\/li>\n<\/ol>\n<p>This contract cannot be taken in account as it is not\u00a0\u00a0\u00a0\u00a0\u00a0 similar with the requested one.<\/p>\n<p>None of the above projects can be taken considered as similar as they are road reconstruction or infrastructure reconstruction. The service required refers to new building construction.<\/p>\n<p>4.2 (b)\u00a0 Specific Construction Experience. The criterion is not fulfilled. The bidder has executed the following volumes:<\/p>\n<p>i.\u00a0 Concrete works: 5,858 m3 completed during 2015 executed in the project for Reconstruction of Promenade Josif Budo and Indrit Cara, Requalification of Central Urban Square Kukes and Construction of Social Building Durres.<\/p>\n<p>ii.\u00a0 Stone tile works: 15,702 m2 in the reconstruction of Pomenade Josif Budo and Indrit Cara during year 2015<\/p>\n<p>iii.\u00a0 Gabion walls: 5,626 m2 executed in the project for Reconstruction of road Kukes Shishtavec lot 1 during year 2014.<\/p>\n<p>The other volumes declared under this specific requirement form the bidder are masonry works or slope protection with mesh works and therefore cannot be considered similar.<\/p>\n<p>iv.\u00a0 Slope seeding works: 47,850 m2 executed during 2018 in the contract for the Construction of west by pass Shkoder.<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>CONTRACT AWARD NOTICE &nbsp; Employer: Albanian Development Fund (ADF) Project: Community Works IV: Development of the Albanian Alps and Coastal Areas Contract title: \u201cConstruction of emergency center Palase, rehabilitation of&#8230;<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"nf_dc_page":"","footnotes":""},"categories":[50,51],"tags":[],"class_list":["post-6405","post","type-post","status-publish","format-standard","hentry","category-prokurime","category-tenderat_fitues"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction of emergency center Palase, rehabilitation of the torrent and parking area in Dhermi village - Fondi Shqiptar i Zhvillimit<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.albaniandf.org\/en\/2019\/10\/08\/construction-of-emergency-center-palase-rehabilitation-of-the-torrent-and-parking-area-in-dhermi-village-3\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction of emergency center Palase, rehabilitation of the torrent and parking area in Dhermi village - Fondi Shqiptar i Zhvillimit\" \/>\n<meta property=\"og:description\" content=\"CONTRACT AWARD NOTICE &nbsp; Employer: Albanian Development Fund (ADF) Project: Community Works IV: Development of the Albanian Alps and Coastal Areas Contract title: \u201cConstruction of emergency center Palase, rehabilitation of...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.albaniandf.org\/en\/2019\/10\/08\/construction-of-emergency-center-palase-rehabilitation-of-the-torrent-and-parking-area-in-dhermi-village-3\/\" \/>\n<meta property=\"og:site_name\" content=\"Fondi Shqiptar i Zhvillimit\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/albaniandf\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-10-08T15:04:21+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/i0.wp.com\/www.albaniandf.org\/wp-content\/uploads\/2021\/09\/Fondi-Shqiptar-i-zhvillimit-logo-original.png?fit=623%2C452&ssl=1\" \/>\n\t<meta property=\"og:image:width\" content=\"623\" \/>\n\t<meta property=\"og:image:height\" content=\"452\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"admin-admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin-admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/2019\\\/10\\\/08\\\/construction-of-emergency-center-palase-rehabilitation-of-the-torrent-and-parking-area-in-dhermi-village-3\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/2019\\\/10\\\/08\\\/construction-of-emergency-center-palase-rehabilitation-of-the-torrent-and-parking-area-in-dhermi-village-3\\\/\"},\"author\":{\"name\":\"admin-admin\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#\\\/schema\\\/person\\\/5aded91f028ee21c8f01a1301b6a4352\"},\"headline\":\"Construction of emergency center Palase, rehabilitation of the torrent and parking area in Dhermi village\",\"datePublished\":\"2019-10-08T15:04:21+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/2019\\\/10\\\/08\\\/construction-of-emergency-center-palase-rehabilitation-of-the-torrent-and-parking-area-in-dhermi-village-3\\\/\"},\"wordCount\":1090,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#organization\"},\"articleSection\":[\"Prokurime\",\"Tenderat Fitues\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.albaniandf.org\\\/2019\\\/10\\\/08\\\/construction-of-emergency-center-palase-rehabilitation-of-the-torrent-and-parking-area-in-dhermi-village-3\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/2019\\\/10\\\/08\\\/construction-of-emergency-center-palase-rehabilitation-of-the-torrent-and-parking-area-in-dhermi-village-3\\\/\",\"url\":\"https:\\\/\\\/www.albaniandf.org\\\/2019\\\/10\\\/08\\\/construction-of-emergency-center-palase-rehabilitation-of-the-torrent-and-parking-area-in-dhermi-village-3\\\/\",\"name\":\"Construction of emergency center Palase, rehabilitation of the torrent and parking area in Dhermi village - Fondi Shqiptar i Zhvillimit\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#website\"},\"datePublished\":\"2019-10-08T15:04:21+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/2019\\\/10\\\/08\\\/construction-of-emergency-center-palase-rehabilitation-of-the-torrent-and-parking-area-in-dhermi-village-3\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.albaniandf.org\\\/2019\\\/10\\\/08\\\/construction-of-emergency-center-palase-rehabilitation-of-the-torrent-and-parking-area-in-dhermi-village-3\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/2019\\\/10\\\/08\\\/construction-of-emergency-center-palase-rehabilitation-of-the-torrent-and-parking-area-in-dhermi-village-3\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.albaniandf.org\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction of emergency center Palase, rehabilitation of the torrent and parking area in Dhermi village\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#website\",\"url\":\"https:\\\/\\\/www.albaniandf.org\\\/\",\"name\":\"Fondi Shqiptar i Zhvillimit\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.albaniandf.org\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#organization\",\"name\":\"Fondi Shqiptar i Zhvillimit\",\"url\":\"https:\\\/\\\/www.albaniandf.org\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.albaniandf.org\\\/wp-content\\\/uploads\\\/2021\\\/08\\\/Fondi-Shqiptar-i-zhvillimit-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.albaniandf.org\\\/wp-content\\\/uploads\\\/2021\\\/08\\\/Fondi-Shqiptar-i-zhvillimit-logo.png\",\"width\":122,\"height\":90,\"caption\":\"Fondi Shqiptar i Zhvillimit\"},\"image\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/albaniandf\\\/\",\"https:\\\/\\\/www.instagram.com\\\/fondi_shqiptar_i_zhvillimit\\\/\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/AlbanianDF\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#\\\/schema\\\/person\\\/5aded91f028ee21c8f01a1301b6a4352\",\"name\":\"admin-admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e39dd0b6e5d33b70cac88c6e9a5f8284419cfb4f9dace3380d3036a3ebb77903?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e39dd0b6e5d33b70cac88c6e9a5f8284419cfb4f9dace3380d3036a3ebb77903?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e39dd0b6e5d33b70cac88c6e9a5f8284419cfb4f9dace3380d3036a3ebb77903?s=96&d=mm&r=g\",\"caption\":\"admin-admin\"},\"url\":\"https:\\\/\\\/www.albaniandf.org\\\/en\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction of emergency center Palase, rehabilitation of the torrent and parking area in Dhermi village - Fondi Shqiptar i Zhvillimit","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.albaniandf.org\/en\/2019\/10\/08\/construction-of-emergency-center-palase-rehabilitation-of-the-torrent-and-parking-area-in-dhermi-village-3\/","og_locale":"en_US","og_type":"article","og_title":"Construction of emergency center Palase, rehabilitation of the torrent and parking area in Dhermi village - Fondi Shqiptar i Zhvillimit","og_description":"CONTRACT AWARD NOTICE &nbsp; Employer: Albanian Development Fund (ADF) Project: Community Works IV: Development of the Albanian Alps and Coastal Areas Contract title: \u201cConstruction of emergency center Palase, rehabilitation of...","og_url":"https:\/\/www.albaniandf.org\/en\/2019\/10\/08\/construction-of-emergency-center-palase-rehabilitation-of-the-torrent-and-parking-area-in-dhermi-village-3\/","og_site_name":"Fondi Shqiptar i Zhvillimit","article_publisher":"https:\/\/www.facebook.com\/albaniandf\/","article_published_time":"2019-10-08T15:04:21+00:00","og_image":[{"width":623,"height":452,"url":"https:\/\/i0.wp.com\/www.albaniandf.org\/wp-content\/uploads\/2021\/09\/Fondi-Shqiptar-i-zhvillimit-logo-original.png?fit=623%2C452&ssl=1","type":"image\/png"}],"author":"admin-admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin-admin","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.albaniandf.org\/2019\/10\/08\/construction-of-emergency-center-palase-rehabilitation-of-the-torrent-and-parking-area-in-dhermi-village-3\/#article","isPartOf":{"@id":"https:\/\/www.albaniandf.org\/2019\/10\/08\/construction-of-emergency-center-palase-rehabilitation-of-the-torrent-and-parking-area-in-dhermi-village-3\/"},"author":{"name":"admin-admin","@id":"https:\/\/www.albaniandf.org\/#\/schema\/person\/5aded91f028ee21c8f01a1301b6a4352"},"headline":"Construction of emergency center Palase, rehabilitation of the torrent and parking area in Dhermi village","datePublished":"2019-10-08T15:04:21+00:00","mainEntityOfPage":{"@id":"https:\/\/www.albaniandf.org\/2019\/10\/08\/construction-of-emergency-center-palase-rehabilitation-of-the-torrent-and-parking-area-in-dhermi-village-3\/"},"wordCount":1090,"commentCount":0,"publisher":{"@id":"https:\/\/www.albaniandf.org\/#organization"},"articleSection":["Prokurime","Tenderat Fitues"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.albaniandf.org\/2019\/10\/08\/construction-of-emergency-center-palase-rehabilitation-of-the-torrent-and-parking-area-in-dhermi-village-3\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.albaniandf.org\/2019\/10\/08\/construction-of-emergency-center-palase-rehabilitation-of-the-torrent-and-parking-area-in-dhermi-village-3\/","url":"https:\/\/www.albaniandf.org\/2019\/10\/08\/construction-of-emergency-center-palase-rehabilitation-of-the-torrent-and-parking-area-in-dhermi-village-3\/","name":"Construction of emergency center Palase, rehabilitation of the torrent and parking area in Dhermi village - Fondi Shqiptar i Zhvillimit","isPartOf":{"@id":"https:\/\/www.albaniandf.org\/#website"},"datePublished":"2019-10-08T15:04:21+00:00","breadcrumb":{"@id":"https:\/\/www.albaniandf.org\/2019\/10\/08\/construction-of-emergency-center-palase-rehabilitation-of-the-torrent-and-parking-area-in-dhermi-village-3\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.albaniandf.org\/2019\/10\/08\/construction-of-emergency-center-palase-rehabilitation-of-the-torrent-and-parking-area-in-dhermi-village-3\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.albaniandf.org\/2019\/10\/08\/construction-of-emergency-center-palase-rehabilitation-of-the-torrent-and-parking-area-in-dhermi-village-3\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.albaniandf.org\/"},{"@type":"ListItem","position":2,"name":"Construction of emergency center Palase, rehabilitation of the torrent and parking area in Dhermi village"}]},{"@type":"WebSite","@id":"https:\/\/www.albaniandf.org\/#website","url":"https:\/\/www.albaniandf.org\/","name":"Albanian Development Fund","description":"","publisher":{"@id":"https:\/\/www.albaniandf.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.albaniandf.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.albaniandf.org\/#organization","name":"Albanian Development Fund","url":"https:\/\/www.albaniandf.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.albaniandf.org\/#\/schema\/logo\/image\/","url":"https:\/\/www.albaniandf.org\/wp-content\/uploads\/2021\/08\/Fondi-Shqiptar-i-zhvillimit-logo.png","contentUrl":"https:\/\/www.albaniandf.org\/wp-content\/uploads\/2021\/08\/Fondi-Shqiptar-i-zhvillimit-logo.png","width":122,"height":90,"caption":"Fondi Shqiptar i Zhvillimit"},"image":{"@id":"https:\/\/www.albaniandf.org\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/albaniandf\/","https:\/\/www.instagram.com\/fondi_shqiptar_i_zhvillimit\/","https:\/\/www.youtube.com\/user\/AlbanianDF"]},{"@type":"Person","@id":"https:\/\/www.albaniandf.org\/#\/schema\/person\/5aded91f028ee21c8f01a1301b6a4352","name":"admin-admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/e39dd0b6e5d33b70cac88c6e9a5f8284419cfb4f9dace3380d3036a3ebb77903?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e39dd0b6e5d33b70cac88c6e9a5f8284419cfb4f9dace3380d3036a3ebb77903?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e39dd0b6e5d33b70cac88c6e9a5f8284419cfb4f9dace3380d3036a3ebb77903?s=96&d=mm&r=g","caption":"admin-admin"},"url":"https:\/\/www.albaniandf.org\/en\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/posts\/6405","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/comments?post=6405"}],"version-history":[{"count":1,"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/posts\/6405\/revisions"}],"predecessor-version":[{"id":6406,"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/posts\/6405\/revisions\/6406"}],"wp:attachment":[{"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/media?parent=6405"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/categories?post=6405"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/tags?post=6405"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}