{"id":3691,"date":"2018-09-21T13:44:50","date_gmt":"2018-09-21T11:44:50","guid":{"rendered":"https:\/\/www.albaniandf.org\/\/?p=3691"},"modified":"2018-09-21T14:26:56","modified_gmt":"2018-09-21T12:26:56","slug":"urban-requalification-of-tamara-second-phase-and-reconstruction-of-vermosh-road-2","status":"publish","type":"post","link":"https:\/\/www.albaniandf.org\/en\/2018\/09\/21\/urban-requalification-of-tamara-second-phase-and-reconstruction-of-vermosh-road-2\/","title":{"rendered":"Urban requalification of Tamara (second phase) and reconstruction of Vermosh road"},"content":{"rendered":"<p><strong>NOTIFICATION OF INTENTION TO AWARD THE CONTRACT<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Employer<\/strong><strong>: <\/strong>Albanian Development Fund (ADF)<\/p>\n<p><strong>Project: <\/strong>Community Works IV: Development of the Albanian Alps and Coastal Areas<\/p>\n<p><strong>Contract title<\/strong><strong>: <\/strong>\u201cUrban requalification of Tamara (second phase) and reconstruction of Vermosh road\u201d<\/p>\n<p><strong>Country: <\/strong>Albania<\/p>\n<p><strong>Loan No.:<\/strong> ALB &#8211; LD 1853<\/p>\n<p><strong>RFB No: <\/strong>CWPIV\/W\/OP\/2018\/15<\/p>\n<p><strong>Issued on: <\/strong>September 21, 2018<\/p>\n<p><strong>I. The duration and summary scope of the contract:<\/strong> The construction period is 10 months. The works consists in the rehabilitation of the existing building in the center of Tamare and a linkage road of 750 m which lead to the border with Montenegro. In this phase is foreseen the rehabilitation of the left over building together with other parts of Tamara. The project foresees the plastering of the existing old building and in the same time preserving their architectural characteristics. Also new roofs will be constructed in accordance with the old methodology and in the same time showing op the decades this building s have gone through.<br \/>\nRequired works are mainly paving works for the linkage segment and the construction of a river protection through gabion walls along the river side.<br \/>\nThe Site is located at Malesia e Madhe municipality.<\/p>\n<p><strong>II. The selection method used:<\/strong> The Most Advantageous Bid.<\/p>\n<p><strong>III. The Bidder <\/strong><strong>submitting the successful Bid: <\/strong>JV &#8220;Nika&#8221; shpk &amp; \u201cS.M.O. Union\u201d shpk. Adr. &#8220;Murat Toptani&#8221;, nr. 25, Tirana.<\/p>\n<p><strong>IV. T<\/strong><strong>he Contract price of the successful Bid: <\/strong>63,977,459 ALL (net of VAT) \u2013 76,772,951 ALL (VAT included).<\/p>\n<p><strong>V. The Bidders who submitted a Bid:<\/strong><\/p>\n<ol>\n<li>&#8220;Curri&#8221; shpk<\/li>\n<li>JV &#8220;Nika&#8221; shpk &amp; \u201cS.M.O. Union\u201d shpk<\/li>\n<\/ol>\n<p><strong>VI. The bid prices as read out at opening<\/strong><strong> of financial <\/strong><strong>parts of bids<\/strong><strong>:<\/strong><\/p>\n<ol>\n<li>&#8220;Curri&#8221; shpk &#8211; 99,046,577 ALL (net of VAT) \u2013 118,855,892 ALL (VAT included).<\/li>\n<li>JV &#8220;Nika&#8221; shpk &amp; \u201cS.M.O. Union\u201d shpk &#8211; 63,977,459 ALL (net of VAT) \u2013 76,772,951 ALL (VAT included)<\/li>\n<\/ol>\n<p><strong>VII. The bid prices as evaluated:<\/strong><\/p>\n<ol>\n<li>&#8220;Curri&#8221; shpk &#8211; 99,046,577 ALL (net of VAT) \u2013 118,855,892 ALL (VAT included).<\/li>\n<li>JV &#8220;Nika&#8221; shpk &amp; \u201cS.M.O. Union\u201d shpk &#8211; 63,977,459 ALL (net of VAT) \u2013 76,772,951 ALL (VAT included)<\/li>\n<\/ol>\n<p><strong>VIII. The standstill period is 10 days.<\/strong><\/p>\n<p><strong>IX. The <\/strong><strong>complaint during the standstill period<\/strong><strong> may by <\/strong><strong>submitted at:<\/strong><\/p>\n<p>Albanian Development Fund<\/p>\n<p>Street Address: Rr. Sami Frasheri, No. 10Floor\/Room number: Ground Floor, Protocol Office<\/p>\n<p>City: Tirana<\/p>\n<p>Country: Albania<\/p>","protected":false},"excerpt":{"rendered":"<p>NOTIFICATION OF INTENTION TO AWARD THE CONTRACT &nbsp; Employer: Albanian Development Fund (ADF) Project: Community Works IV: Development of the Albanian Alps and Coastal Areas Contract title: \u201cUrban requalification of&#8230;<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"nf_dc_page":"","footnotes":""},"categories":[50,54],"tags":[],"class_list":["post-3691","post","type-post","status-publish","format-standard","hentry","category-prokurime","category-punime_civile"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Urban requalification of Tamara (second phase) and reconstruction of Vermosh road - Fondi Shqiptar i Zhvillimit<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.albaniandf.org\/en\/2018\/09\/21\/urban-requalification-of-tamara-second-phase-and-reconstruction-of-vermosh-road-2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Urban requalification of Tamara (second phase) and reconstruction of Vermosh road - Fondi Shqiptar i Zhvillimit\" \/>\n<meta property=\"og:description\" content=\"NOTIFICATION OF INTENTION TO AWARD THE CONTRACT &nbsp; Employer: Albanian Development Fund (ADF) Project: Community Works IV: Development of the Albanian Alps and Coastal Areas Contract title: \u201cUrban requalification of...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.albaniandf.org\/en\/2018\/09\/21\/urban-requalification-of-tamara-second-phase-and-reconstruction-of-vermosh-road-2\/\" \/>\n<meta property=\"og:site_name\" content=\"Fondi Shqiptar i Zhvillimit\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/albaniandf\/\" \/>\n<meta property=\"article:published_time\" content=\"2018-09-21T11:44:50+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2018-09-21T12:26:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/i0.wp.com\/www.albaniandf.org\/wp-content\/uploads\/2021\/09\/Fondi-Shqiptar-i-zhvillimit-logo-original.png?fit=623%2C452&ssl=1\" \/>\n\t<meta property=\"og:image:width\" content=\"623\" \/>\n\t<meta property=\"og:image:height\" content=\"452\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"admin-admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin-admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/2018\\\/09\\\/21\\\/urban-requalification-of-tamara-second-phase-and-reconstruction-of-vermosh-road-2\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/2018\\\/09\\\/21\\\/urban-requalification-of-tamara-second-phase-and-reconstruction-of-vermosh-road-2\\\/\"},\"author\":{\"name\":\"admin-admin\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#\\\/schema\\\/person\\\/5aded91f028ee21c8f01a1301b6a4352\"},\"headline\":\"Urban requalification of Tamara (second phase) and reconstruction of Vermosh road\",\"datePublished\":\"2018-09-21T11:44:50+00:00\",\"dateModified\":\"2018-09-21T12:26:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/2018\\\/09\\\/21\\\/urban-requalification-of-tamara-second-phase-and-reconstruction-of-vermosh-road-2\\\/\"},\"wordCount\":378,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#organization\"},\"articleSection\":[\"Prokurime\",\"Punime Civile\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.albaniandf.org\\\/2018\\\/09\\\/21\\\/urban-requalification-of-tamara-second-phase-and-reconstruction-of-vermosh-road-2\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/2018\\\/09\\\/21\\\/urban-requalification-of-tamara-second-phase-and-reconstruction-of-vermosh-road-2\\\/\",\"url\":\"https:\\\/\\\/www.albaniandf.org\\\/2018\\\/09\\\/21\\\/urban-requalification-of-tamara-second-phase-and-reconstruction-of-vermosh-road-2\\\/\",\"name\":\"Urban requalification of Tamara (second phase) and reconstruction of Vermosh road - Fondi Shqiptar i Zhvillimit\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#website\"},\"datePublished\":\"2018-09-21T11:44:50+00:00\",\"dateModified\":\"2018-09-21T12:26:56+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/2018\\\/09\\\/21\\\/urban-requalification-of-tamara-second-phase-and-reconstruction-of-vermosh-road-2\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.albaniandf.org\\\/2018\\\/09\\\/21\\\/urban-requalification-of-tamara-second-phase-and-reconstruction-of-vermosh-road-2\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/2018\\\/09\\\/21\\\/urban-requalification-of-tamara-second-phase-and-reconstruction-of-vermosh-road-2\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.albaniandf.org\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Urban requalification of Tamara (second phase) and reconstruction of Vermosh road\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#website\",\"url\":\"https:\\\/\\\/www.albaniandf.org\\\/\",\"name\":\"Fondi Shqiptar i Zhvillimit\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.albaniandf.org\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#organization\",\"name\":\"Fondi Shqiptar i Zhvillimit\",\"url\":\"https:\\\/\\\/www.albaniandf.org\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.albaniandf.org\\\/wp-content\\\/uploads\\\/2021\\\/08\\\/Fondi-Shqiptar-i-zhvillimit-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.albaniandf.org\\\/wp-content\\\/uploads\\\/2021\\\/08\\\/Fondi-Shqiptar-i-zhvillimit-logo.png\",\"width\":122,\"height\":90,\"caption\":\"Fondi Shqiptar i Zhvillimit\"},\"image\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/albaniandf\\\/\",\"https:\\\/\\\/www.instagram.com\\\/fondi_shqiptar_i_zhvillimit\\\/\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/AlbanianDF\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#\\\/schema\\\/person\\\/5aded91f028ee21c8f01a1301b6a4352\",\"name\":\"admin-admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e39dd0b6e5d33b70cac88c6e9a5f8284419cfb4f9dace3380d3036a3ebb77903?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e39dd0b6e5d33b70cac88c6e9a5f8284419cfb4f9dace3380d3036a3ebb77903?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e39dd0b6e5d33b70cac88c6e9a5f8284419cfb4f9dace3380d3036a3ebb77903?s=96&d=mm&r=g\",\"caption\":\"admin-admin\"},\"url\":\"https:\\\/\\\/www.albaniandf.org\\\/en\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Urban requalification of Tamara (second phase) and reconstruction of Vermosh road - Fondi Shqiptar i Zhvillimit","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.albaniandf.org\/en\/2018\/09\/21\/urban-requalification-of-tamara-second-phase-and-reconstruction-of-vermosh-road-2\/","og_locale":"en_US","og_type":"article","og_title":"Urban requalification of Tamara (second phase) and reconstruction of Vermosh road - Fondi Shqiptar i Zhvillimit","og_description":"NOTIFICATION OF INTENTION TO AWARD THE CONTRACT &nbsp; Employer: Albanian Development Fund (ADF) Project: Community Works IV: Development of the Albanian Alps and Coastal Areas Contract title: \u201cUrban requalification of...","og_url":"https:\/\/www.albaniandf.org\/en\/2018\/09\/21\/urban-requalification-of-tamara-second-phase-and-reconstruction-of-vermosh-road-2\/","og_site_name":"Fondi Shqiptar i Zhvillimit","article_publisher":"https:\/\/www.facebook.com\/albaniandf\/","article_published_time":"2018-09-21T11:44:50+00:00","article_modified_time":"2018-09-21T12:26:56+00:00","og_image":[{"width":623,"height":452,"url":"https:\/\/i0.wp.com\/www.albaniandf.org\/wp-content\/uploads\/2021\/09\/Fondi-Shqiptar-i-zhvillimit-logo-original.png?fit=623%2C452&ssl=1","type":"image\/png"}],"author":"admin-admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin-admin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.albaniandf.org\/2018\/09\/21\/urban-requalification-of-tamara-second-phase-and-reconstruction-of-vermosh-road-2\/#article","isPartOf":{"@id":"https:\/\/www.albaniandf.org\/2018\/09\/21\/urban-requalification-of-tamara-second-phase-and-reconstruction-of-vermosh-road-2\/"},"author":{"name":"admin-admin","@id":"https:\/\/www.albaniandf.org\/#\/schema\/person\/5aded91f028ee21c8f01a1301b6a4352"},"headline":"Urban requalification of Tamara (second phase) and reconstruction of Vermosh road","datePublished":"2018-09-21T11:44:50+00:00","dateModified":"2018-09-21T12:26:56+00:00","mainEntityOfPage":{"@id":"https:\/\/www.albaniandf.org\/2018\/09\/21\/urban-requalification-of-tamara-second-phase-and-reconstruction-of-vermosh-road-2\/"},"wordCount":378,"commentCount":0,"publisher":{"@id":"https:\/\/www.albaniandf.org\/#organization"},"articleSection":["Prokurime","Punime Civile"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.albaniandf.org\/2018\/09\/21\/urban-requalification-of-tamara-second-phase-and-reconstruction-of-vermosh-road-2\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.albaniandf.org\/2018\/09\/21\/urban-requalification-of-tamara-second-phase-and-reconstruction-of-vermosh-road-2\/","url":"https:\/\/www.albaniandf.org\/2018\/09\/21\/urban-requalification-of-tamara-second-phase-and-reconstruction-of-vermosh-road-2\/","name":"Urban requalification of Tamara (second phase) and reconstruction of Vermosh road - Fondi Shqiptar i Zhvillimit","isPartOf":{"@id":"https:\/\/www.albaniandf.org\/#website"},"datePublished":"2018-09-21T11:44:50+00:00","dateModified":"2018-09-21T12:26:56+00:00","breadcrumb":{"@id":"https:\/\/www.albaniandf.org\/2018\/09\/21\/urban-requalification-of-tamara-second-phase-and-reconstruction-of-vermosh-road-2\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.albaniandf.org\/2018\/09\/21\/urban-requalification-of-tamara-second-phase-and-reconstruction-of-vermosh-road-2\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.albaniandf.org\/2018\/09\/21\/urban-requalification-of-tamara-second-phase-and-reconstruction-of-vermosh-road-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.albaniandf.org\/"},{"@type":"ListItem","position":2,"name":"Urban requalification of Tamara (second phase) and reconstruction of Vermosh road"}]},{"@type":"WebSite","@id":"https:\/\/www.albaniandf.org\/#website","url":"https:\/\/www.albaniandf.org\/","name":"Albanian Development Fund","description":"","publisher":{"@id":"https:\/\/www.albaniandf.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.albaniandf.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.albaniandf.org\/#organization","name":"Albanian Development Fund","url":"https:\/\/www.albaniandf.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.albaniandf.org\/#\/schema\/logo\/image\/","url":"https:\/\/www.albaniandf.org\/wp-content\/uploads\/2021\/08\/Fondi-Shqiptar-i-zhvillimit-logo.png","contentUrl":"https:\/\/www.albaniandf.org\/wp-content\/uploads\/2021\/08\/Fondi-Shqiptar-i-zhvillimit-logo.png","width":122,"height":90,"caption":"Fondi Shqiptar i Zhvillimit"},"image":{"@id":"https:\/\/www.albaniandf.org\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/albaniandf\/","https:\/\/www.instagram.com\/fondi_shqiptar_i_zhvillimit\/","https:\/\/www.youtube.com\/user\/AlbanianDF"]},{"@type":"Person","@id":"https:\/\/www.albaniandf.org\/#\/schema\/person\/5aded91f028ee21c8f01a1301b6a4352","name":"admin-admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/e39dd0b6e5d33b70cac88c6e9a5f8284419cfb4f9dace3380d3036a3ebb77903?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e39dd0b6e5d33b70cac88c6e9a5f8284419cfb4f9dace3380d3036a3ebb77903?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e39dd0b6e5d33b70cac88c6e9a5f8284419cfb4f9dace3380d3036a3ebb77903?s=96&d=mm&r=g","caption":"admin-admin"},"url":"https:\/\/www.albaniandf.org\/en\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/posts\/3691","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/comments?post=3691"}],"version-history":[{"count":0,"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/posts\/3691\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/media?parent=3691"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/categories?post=3691"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/tags?post=3691"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}