{"id":12942,"date":"2026-06-15T17:19:40","date_gmt":"2026-06-15T15:19:40","guid":{"rendered":"https:\/\/www.albaniandf.org\/?page_id=12942"},"modified":"2026-06-15T17:19:40","modified_gmt":"2026-06-15T15:19:40","slug":"projekte-per-investim","status":"publish","type":"page","link":"https:\/\/www.albaniandf.org\/en\/projekte-per-investim\/","title":{"rendered":"INVESTMENT PROJECTS"},"content":{"rendered":"<div class=\"full-width-accordion-wrapper\">  <div class=\"accordion-grid-container\">    <div class=\"accordion-header-cell\" data-item-id=\"header\" data-target=\"content-header\" data-item-order=\"0\">INVESTMENT PROJECTS    <\/div>    <div class=\"accordion-item\" data-item-id=\"1\" data-target=\"content-1\" data-item-order=\"1\">Support for strengthening the management capacities of municipalities through the application of grant schemes, Phase II<\/div>    <div class=\"accordion-item\" data-item-id=\"2\" data-target=\"content-2\" data-item-order=\"2\">Nd\u00ebrhyrje p\u00ebr p\u00ebrmir\u00ebsimin e shtresave asfaltike, Faza V<\/div>    <div class=\"accordion-item\" data-item-id=\"3\" data-target=\"content-3\" data-item-order=\"3\">Nd\u00ebrhyrje p\u00ebr rigjenerim urban t\u00eb stokut t\u00eb banesave, Faza IV<\/div>    <div class=\"accordion-item\" data-item-id=\"4\" data-target=\"content-4\" data-item-order=\"4\">P\u00ebrmir\u00ebsimi i transportit dhe aksesit n\u00ebp\u00ebrmjet nd\u00ebrhyrjeve n\u00eb rrug\u00ebt e bardha ( FAZA III)<\/div>    <div id=\"accordion-content-wrapper\" class=\"accordion-content-wrapper\">      <div id=\"content-header\" class=\"accordion-panel\" data-panel-id=\"header\" data-item-order=\"0\" style=\"display:none;\">        <h2> <\/h2><p>In order to increase efficiency, transparency and equal access to financial support for development interventions, ADF has built and put into operation a digital application platform for the open calls it administers. This platform represents an important step towards the modernization of the processes of the Albanian Development Fund and the strengthening of cooperation with beneficiary public institutions. <\/p>\r\n<p>The platform serves local government units and central government institutions, as the main beneficiaries of ADF support, by enabling them to apply entirely electronically for interventions planned within the framework of various budgetary programmes managed by the Fund. Through this system, applicant institutions have centralized access, in a single platform, to information on active calls, application criteria and the required documentation, as well as the opportunity to apply in real time to various calls for specific interventions, through a simplified, transparent and fully traceable process. <\/p>\r\n<p>The digital approach aims to simplify, standardize and improve the quality of the application process, by reducing the administrative burden and increasing the accuracy and completeness of submitted applications. At the same time, the platform contributes to reducing the use of paper documentation, reflecting ADF\u2019s concrete commitment to greener practices, the efficient use of resources and the promotion of institutional innovation. <\/p>\r\n      <\/div>      <div id=\"content-1\" class=\"accordion-panel\" data-panel-id=\"1\" data-item-order=\"1\" style=\"display:none;\">        <h2>Support for strengthening the management capacities of municipalities through the application of grant schemes, Phase II<\/h2><p>The Albanian Development Fund, within the framework of the interventions programmed and budgeted under the Operational Programme for the medium-term period 2026\u20132028, in the \u201cRegional Local Infrastructure\u201d Financing Programme, has planned the intervention \u201cSupport for strengthening the management capacities of municipalities\u201d, through which the scheme \u201cMunicipal Capacity Incentive Mechanism for Project Implementation \u2013 Phase II\u201d will also be implemented. <\/p>\r\n<p>This initiative follows the first open call launched in 2024, from which 23 municipalities benefited, with the aim of strengthening the capacities of local self-government units in the conceptualization, management and implementation of regional development projects across various development sectors. <\/p>\r\n<p>The project aims to strengthen the capacities of municipalities to function as more capable implementing structures for development interventions. At the same time, the intervention aims to contribute to strengthening the development identity of areas and increasing the direct impact of interventions on the community. <\/p>\r\n<p>In this context, the projects aim to guide local development in line with the functions and potentials of the territories, by encouraging initiatives that contribute to the development profiling of the regions and to strengthening their role in the regional and national system. <\/p>\r\n<p>The application will be electronic and will be carried out in the system at the following link:<\/p>\r\n<p>Apliko: <a href=\"https:\/\/arkiva.albaniandf.org\/web#action=310&amp;active_id=10&amp;cids=1&amp;menu_id=190\" target=\"_blank\" rel=\"noopener noreferrer\">Support for strengthening the management capacities of municipalities through the application of grant schemes, Phase II<\/a><\/p>\r\n<p> <u>This call will remain open until<\/u>  <u>15.07.2026<\/u> <\/p>\r\n      <\/div>      <div id=\"content-2\" class=\"accordion-panel\" data-panel-id=\"2\" data-item-order=\"2\" style=\"display:none;\">        <h2>Nd\u00ebrhyrje p\u00ebr p\u00ebrmir\u00ebsimin e shtresave asfaltike, Faza V<\/h2><p>Q\u00ebllimi i k\u00ebsaj nd\u00ebrhyrjeje \u00ebsht\u00eb transformimi i konektivitetit rajonal dhe vendor midis zonave urbane kryesore, zonave ekonomike, zonave prodhuese, qendrave t\u00eb sh\u00ebrbimeve n\u00ebp\u00ebrmjet p\u00ebrmir\u00ebsimit t\u00eb shtresave asfaltike, strukturave dhe mbrojtjes rrugore.<\/p>\r\n\r\n<p>Kjo thirrje ka si q\u00ebllim identifikimin e projekteve t\u00eb mundshme p\u00ebr tu zbatuar n\u00eb kuad\u00ebr t\u00eb k\u00ebsaj nd\u00ebrhyrje duke p\u00ebrdorur qasjen bottom-up t\u00eb caktimit t\u00eb prioriteteve, bazuar n\u00eb k\u00ebrkesat e nj\u00ebsive t\u00eb vetqeverisjes lokale, t\u00eb cil\u00ebt jan\u00eb p\u00ebrfituesit e k\u00ebsaj pakete nd\u00ebrhyrje.<\/p>\r\n\r\n<p>Tipologjit\u00eb e nd\u00ebrhyrjes q\u00eb mund t\u00eb financohen n\u00ebp\u00ebrmjet k\u00ebsaj thirrjeje jan\u00eb t\u00eb fokusuara vet\u00ebm n\u00eb rrug\u00eb ekzistuese, t\u00eb q\u00ebndrueshme nga pikpamja e bazamentit dhe kan\u00eb d\u00ebmtim t\u00eb shtresave sip\u00ebrfaq\u00ebsore apo kan\u00eb nevoj\u00eb p\u00ebr nd\u00ebrhyrje t\u00eb kufizuara n\u00eb struktur\u00ebn e saj vet\u00ebm n\u00eb segmente t\u00eb ve\u00e7anta. Nuk p\u00ebrfshihen n\u00ebn k\u00ebt\u00eb paket\u00eb nd\u00ebrhyrje n\u00eb infrastruktur\u00ebn n\u00ebntok\u00ebsore, uj\u00ebsjell\u00ebs kanalizime, trotuare etj. K\u00ebto z\u00ebra mund t\u00eb jen\u00eb bashk\u00ebkontribut nga ana e bashkis\u00eb.<\/p>\r\n\r\n<p>The application will be electronic and will be carried out in the system at the following link:<\/p>\r\n<p>Apliko: <a href=\"https:\/\/arkiva.albaniandf.org\/web#action=258&amp;active_id=1&amp;model=fshzh.call&amp;view_type=kanban&amp;cids=1&amp;menu_id=190\" target=\"_blank\" rel=\"noopener noreferrer\">Nd\u00ebrhyrje p\u00ebr p\u00ebrmir\u00ebsimin e shtresave asfaltike, Faza V<\/a><\/p>\r\n<p> <u>Thirrja do t\u00eb rrij\u00eb e hapur deri n\u00eb ezaurimin e plot\u00eb t\u00eb fondeve n\u00eb dispozicion p\u00ebr k\u00ebt\u00eb nd\u00ebrhyrje.<\/u> <\/p>      <\/div>      <div id=\"content-3\" class=\"accordion-panel\" data-panel-id=\"3\" data-item-order=\"3\" style=\"display:none;\">        <h2>Nd\u00ebrhyrje p\u00ebr rigjenerim urban t\u00eb stokut t\u00eb banesave, Faza IV<\/h2><p>Q\u00ebllimi i k\u00ebsaj nd\u00ebrhyrjeje \u00ebsht\u00eb p\u00ebrmir\u00ebsimi i kushteve t\u00eb banimit dhe rritja e eficienc\u00ebs energjetike n\u00eb nd\u00ebrtesat ekzistuese, p\u00ebrmes rehabilitimit t\u00eb fasadave dhe aplikimit t\u00eb sistemeve termoizoluese. Nd\u00ebrhyrja synon t\u00eb reduktoj\u00eb humbjet e energjis\u00eb, t\u00eb p\u00ebrmir\u00ebsoj\u00eb komoditetin termik p\u00ebr banor\u00ebt dhe t\u00eb rris\u00eb mbrojtjen e nd\u00ebrtesave ndaj faktor\u00ebve atmosferik\u00eb.<\/p>\r\n\r\n<p>P\u00ebrmes k\u00ebsaj pakete investimi synohet transformimi i blloqeve t\u00eb banimit n\u00eb hap\u00ebsira m\u00eb funksionale, m\u00eb estetike dhe m\u00eb t\u00eb q\u00ebndrueshme. Rehabilitimi i fasadave do t\u00eb ndikoj\u00eb drejtp\u00ebrdrejt n\u00eb p\u00ebrmir\u00ebsimin e pamjes urbane, n\u00eb rritjen e cil\u00ebsis\u00eb s\u00eb jet\u00ebs s\u00eb komunitetit dhe n\u00eb krijimin e nj\u00eb mjedisi m\u00eb t\u00eb rregullt e m\u00eb t\u00ebrheq\u00ebs p\u00ebr banor\u00ebt dhe qytetin.<\/p>\r\n\r\n<p>Nd\u00ebrhyrja ka gjithashtu p\u00ebr q\u00ebllim t\u00eb vijoj\u00eb modelet pozitive t\u00eb investimeve t\u00eb m\u00ebparshme, duke iu p\u00ebrgjigjur k\u00ebrkesave t\u00eb bashkive p\u00ebr k\u00ebt\u00eb tipologji projektesh. P\u00ebrmes sistemit kapot\u00eb dhe termoizolimit t\u00eb fasadave, projekti kontribuon n\u00eb uljen e konsumit t\u00eb energjis\u00eb, rritjen e vler\u00ebs s\u00eb pronave dhe zhvillimin e q\u00ebndruesh\u00ebm urban n\u00eb zonat ku do t\u00eb zbatohet.<\/p>\r\n\r\n<p>The application will be electronic and will be carried out in the system at the following link:<\/p>\r\n<p>Apliko: <a href=\"https:\/\/arkiva.albaniandf.org\/web#action=258&amp;active_id=2&amp;model=fshzh.call&amp;view_type=kanban&amp;cids=1&amp;menu_id=190\" target=\"_blank\" rel=\"noopener noreferrer\">Nd\u00ebrhyrje p\u00ebr rigjenerim urban i stokut t\u00eb banesave, Faza IV<\/a><\/p>\r\n\r\n<p> <u>Thirrja do t\u00eb rrij\u00eb e hapur deri n\u00eb ezaurimin e plot\u00eb t\u00eb fondeve n\u00eb dispozicion p\u00ebr k\u00ebt\u00eb nd\u00ebrhyrje.<\/u> <\/p>      <\/div>      <div id=\"content-4\" class=\"accordion-panel\" data-panel-id=\"4\" data-item-order=\"4\" style=\"display:none;\">        <h2>P\u00ebrmir\u00ebsimi i transportit dhe aksesit n\u00ebp\u00ebrmjet nd\u00ebrhyrjeve n\u00eb rrug\u00ebt e bardha ( FAZA III)<\/h2><p>Q\u00ebllimi i k\u00ebsaj nd\u00ebrhyrjeje \u00ebsht\u00eb p\u00ebrmir\u00ebsimi i transportit dhe rritja e aksesit n\u00eb zonat rurale, p\u00ebrmes nd\u00ebrtimit, rikonstruksionit dhe rehabilitimit t\u00eb rrug\u00ebve t\u00eb bardha. Nd\u00ebrhyrja synon t\u00eb forcoj\u00eb konektivitetin territorial, t\u00eb leht\u00ebsoj\u00eb l\u00ebvizjen e banor\u00ebve dhe t\u00eb mallrave, si dhe t\u00eb rris\u00eb sigurin\u00eb dhe funksionalitetin e rrjetit rrugor rural.<\/p>\r\n\r\n<p>P\u00ebrmes k\u00ebsaj pakete investimi synohet p\u00ebrmir\u00ebsimi i lidhjes s\u00eb komuniteteve rurale me qendrat administrative, tregjet, sh\u00ebrbimet sociale, institucionet arsimore dhe sh\u00ebndet\u00ebsore, si dhe me akset kryesore t\u00eb transportit. Nd\u00ebrhyrjet n\u00eb rrug\u00ebt e bardha do t\u00eb ndikojn\u00eb drejtp\u00ebrdrejt n\u00eb uljen e izolimit t\u00eb zonave rurale, n\u00eb rritjen e mund\u00ebsive p\u00ebr pun\u00ebsim dhe n\u00eb mb\u00ebshtetjen e zhvillimit ekonomik lokal.<\/p>\r\n\r\n<p>Tipologjit\u00eb e nd\u00ebrhyrjes q\u00eb mund t\u00eb financohen n\u00ebp\u00ebrmjet k\u00ebsaj thirrjeje jan\u00eb t\u00eb fokusuara n\u00eb nd\u00ebrtimin e rrug\u00ebve t\u00eb bardha n\u00eb gjurm\u00eb ekzistuese ose n\u00eb gjurm\u00eb t\u00eb re, n\u00eb nd\u00ebrhyrje inxhinierike p\u00ebr stabilizimin e rr\u00ebshqitjeve, vendosjen e veprave t\u00eb artit etj. Nuk p\u00ebrfshihen n\u00ebn k\u00ebt\u00eb paket\u00eb p\u00ebrmir\u00ebsimi i shtresave asfaltike, nd\u00ebrhyrje n\u00eb infrastruktur\u00ebn n\u00ebntok\u00ebsore, uj\u00ebsjell\u00ebs kanalizime, trotuare etj. K\u00ebto z\u00ebra mund t\u00eb jen\u00eb bashk\u00ebkontribut nga ana e bashkis\u00eb.<\/p>\r\n\r\n<p>The application will be electronic and will be carried out in the system at the following link:<\/p>\r\n\r\n<p>Apliko: <a href=\"https:\/\/arkiva.albaniandf.org\/web#action=258&amp;active_id=1&amp;model=fshzh.call&amp;view_type=kanban&amp;cids=1&amp;menu_id=190\" target=\"_blank\" rel=\"noopener noreferrer\"><u>P\u00ebrmir\u00ebsimi i transportit dhe aksesit n\u00ebp\u00ebrmjet nd\u00ebrhyrjeve n\u00eb rrug\u00ebt e bardha (FAZA III)<\/u><\/a><\/p>\r\n\r\n<p><u>Thirrja do t\u00eb rrij\u00eb e hapur deri n\u00eb ezaurimin e plot\u00eb t\u00eb fondeve n\u00eb dispozicion p\u00ebr k\u00ebt\u00eb nd\u00ebrhyrje.<\/u><\/p>\r\n      <\/div>    <\/div>  <\/div><div class=\"accordion-footer\">  <hr class=\"footer-line\">  <div class=\"footer-content\">    <a href=\"https:\/\/www.albaniandf.org\/en\/\" target=\"_blank\" class=\"footer-logo\" rel=\"noopener\">      <img data-recalc-dims=\"1\" decoding=\"async\" src=\"https:\/\/i0.wp.com\/www.albaniandf.org\/wp-content\/uploads\/2025\/10\/Fondi-Shqiptar-i-zhvillimit-logo-horizontal-Copy.png?ssl=1\" alt=\"FSHZH Logo\">    <\/a>  <\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>PROJEKTE PER INVESTIM Mb\u00ebshtetje p\u00ebr fuqizimin e kapaciteteve menaxhuese t\u00eb bashkive n\u00ebp\u00ebrmjet aplikimit t\u00eb skemave t\u00eb granteve, Faza II Nd\u00ebrhyrje p\u00ebr p\u00ebrmir\u00ebsimin e shtresave asfaltike, Faza V Nd\u00ebrhyrje p\u00ebr rigjenerim&#8230;<\/p>","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"nf_dc_page":"","footnotes":""},"class_list":["post-12942","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>PROJEKTE PER INVESTIM - Fondi Shqiptar i Zhvillimit<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.albaniandf.org\/en\/projekte-per-investim\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"PROJEKTE PER INVESTIM - Fondi Shqiptar i Zhvillimit\" \/>\n<meta property=\"og:description\" content=\"PROJEKTE PER INVESTIM Mb\u00ebshtetje p\u00ebr fuqizimin e kapaciteteve menaxhuese t\u00eb bashkive n\u00ebp\u00ebrmjet aplikimit t\u00eb skemave t\u00eb granteve, Faza II Nd\u00ebrhyrje p\u00ebr p\u00ebrmir\u00ebsimin e shtresave asfaltike, Faza V Nd\u00ebrhyrje p\u00ebr rigjenerim...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.albaniandf.org\/en\/projekte-per-investim\/\" \/>\n<meta property=\"og:site_name\" content=\"Fondi Shqiptar i Zhvillimit\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/albaniandf\/\" \/>\n<meta property=\"og:image\" content=\"https:\/\/i0.wp.com\/www.albaniandf.org\/wp-content\/uploads\/2021\/09\/Fondi-Shqiptar-i-zhvillimit-logo-original.png?fit=623%2C452&ssl=1\" \/>\n\t<meta property=\"og:image:width\" content=\"623\" \/>\n\t<meta property=\"og:image:height\" content=\"452\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/projekte-per-investim\\\/\",\"url\":\"https:\\\/\\\/www.albaniandf.org\\\/projekte-per-investim\\\/\",\"name\":\"PROJEKTE PER INVESTIM - Fondi Shqiptar i Zhvillimit\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#website\"},\"datePublished\":\"2026-06-15T15:19:40+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/projekte-per-investim\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.albaniandf.org\\\/projekte-per-investim\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/projekte-per-investim\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.albaniandf.org\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"PROJEKTE PER INVESTIM\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#website\",\"url\":\"https:\\\/\\\/www.albaniandf.org\\\/\",\"name\":\"Fondi Shqiptar i Zhvillimit\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.albaniandf.org\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#organization\",\"name\":\"Fondi Shqiptar i Zhvillimit\",\"url\":\"https:\\\/\\\/www.albaniandf.org\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/www.albaniandf.org\\\/wp-content\\\/uploads\\\/2021\\\/08\\\/Fondi-Shqiptar-i-zhvillimit-logo.png?fit=122%2C90&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/www.albaniandf.org\\\/wp-content\\\/uploads\\\/2021\\\/08\\\/Fondi-Shqiptar-i-zhvillimit-logo.png?fit=122%2C90&ssl=1\",\"width\":122,\"height\":90,\"caption\":\"Fondi Shqiptar i Zhvillimit\"},\"image\":{\"@id\":\"https:\\\/\\\/www.albaniandf.org\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/albaniandf\\\/\",\"https:\\\/\\\/www.instagram.com\\\/fondi_shqiptar_i_zhvillimit\\\/\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/AlbanianDF\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"PROJEKTE PER INVESTIM - Fondi Shqiptar i Zhvillimit","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.albaniandf.org\/en\/projekte-per-investim\/","og_locale":"en_US","og_type":"article","og_title":"PROJEKTE PER INVESTIM - Fondi Shqiptar i Zhvillimit","og_description":"PROJEKTE PER INVESTIM Mb\u00ebshtetje p\u00ebr fuqizimin e kapaciteteve menaxhuese t\u00eb bashkive n\u00ebp\u00ebrmjet aplikimit t\u00eb skemave t\u00eb granteve, Faza II Nd\u00ebrhyrje p\u00ebr p\u00ebrmir\u00ebsimin e shtresave asfaltike, Faza V Nd\u00ebrhyrje p\u00ebr rigjenerim...","og_url":"https:\/\/www.albaniandf.org\/en\/projekte-per-investim\/","og_site_name":"Fondi Shqiptar i Zhvillimit","article_publisher":"https:\/\/www.facebook.com\/albaniandf\/","og_image":[{"width":623,"height":452,"url":"https:\/\/i0.wp.com\/www.albaniandf.org\/wp-content\/uploads\/2021\/09\/Fondi-Shqiptar-i-zhvillimit-logo-original.png?fit=623%2C452&ssl=1","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.albaniandf.org\/projekte-per-investim\/","url":"https:\/\/www.albaniandf.org\/projekte-per-investim\/","name":"PROJEKTE PER INVESTIM - Fondi Shqiptar i Zhvillimit","isPartOf":{"@id":"https:\/\/www.albaniandf.org\/#website"},"datePublished":"2026-06-15T15:19:40+00:00","breadcrumb":{"@id":"https:\/\/www.albaniandf.org\/projekte-per-investim\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.albaniandf.org\/projekte-per-investim\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.albaniandf.org\/projekte-per-investim\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.albaniandf.org\/"},{"@type":"ListItem","position":2,"name":"PROJEKTE PER INVESTIM"}]},{"@type":"WebSite","@id":"https:\/\/www.albaniandf.org\/#website","url":"https:\/\/www.albaniandf.org\/","name":"Albanian Development Fund","description":"","publisher":{"@id":"https:\/\/www.albaniandf.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.albaniandf.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.albaniandf.org\/#organization","name":"Albanian Development Fund","url":"https:\/\/www.albaniandf.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.albaniandf.org\/#\/schema\/logo\/image\/","url":"https:\/\/i0.wp.com\/www.albaniandf.org\/wp-content\/uploads\/2021\/08\/Fondi-Shqiptar-i-zhvillimit-logo.png?fit=122%2C90&ssl=1","contentUrl":"https:\/\/i0.wp.com\/www.albaniandf.org\/wp-content\/uploads\/2021\/08\/Fondi-Shqiptar-i-zhvillimit-logo.png?fit=122%2C90&ssl=1","width":122,"height":90,"caption":"Fondi Shqiptar i Zhvillimit"},"image":{"@id":"https:\/\/www.albaniandf.org\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/albaniandf\/","https:\/\/www.instagram.com\/fondi_shqiptar_i_zhvillimit\/","https:\/\/www.youtube.com\/user\/AlbanianDF"]}]}},"_links":{"self":[{"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/pages\/12942","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/comments?post=12942"}],"version-history":[{"count":1,"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/pages\/12942\/revisions"}],"predecessor-version":[{"id":12944,"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/pages\/12942\/revisions\/12944"}],"wp:attachment":[{"href":"https:\/\/www.albaniandf.org\/en\/wp-json\/wp\/v2\/media?parent=12942"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}