<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>PIUTD Archives - Fondi Shqiptar i Zhvillimit</title>
	<atom:link href="https://www.albaniandf.org/en/tag/piutd/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.albaniandf.org/en/tag/piutd/</link>
	<description></description>
	<lastbuilddate>Mon, 09 Nov 2020 11:35:13 +0000</lastbuilddate>
	<language>en-US</language>
	<sy:updateperiod>
	hourly	</sy:updateperiod>
	<sy:updatefrequency>
	1	</sy:updatefrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>

<image>
	<url>https://i0.wp.com/www.albaniandf.org/wp-content/uploads/2021/08/FSHZH-favicon.png?fit=32%2C32&#038;ssl=1</url>
	<title>PIUTD Archives - Fondi Shqiptar i Zhvillimit</title>
	<link>https://www.albaniandf.org/en/tag/piutd/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Planet e menaxhimit, interpretimit dhe eksperienca e vizitorëve për zonën turistike Zvërnec Nartë/Ujërat Termale, Bënjë-Permet</title>
		<link>https://www.albaniandf.org/en/2020/11/09/planet-e-menaxhimit-interpretimit-dhe-eksperienca-e-vizitoreve-per-zonen-turistike-zvernec-narte-ujerat-termale-benje-permet/</link>
					<comments>https://www.albaniandf.org/en/2020/11/09/planet-e-menaxhimit-interpretimit-dhe-eksperienca-e-vizitoreve-per-zonen-turistike-zvernec-narte-ujerat-termale-benje-permet/#respond</comments>
		
		<dc:creator><![CDATA[admin-admin]]></dc:creator>
		<pubdate>Mon, 09 Nov 2020 11:32:52 +0000</pubdate>
				<category><![CDATA[Prokurime]]></category>
		<category><![CDATA[Punime Civile]]></category>
		<category><![CDATA[PIUTD]]></category>
		<guid ispermalink="false">https://www.albaniandf.org/?p=8766</guid>

					<description><![CDATA[<p>FTESË PËR OFERTË &#160; SHQIPËRI Projekti për Integrimin Urban dhe Zhvillimin e Turizmit Hua nga IBRD:  Nr. 8656- ALB Titulli i Kontratës:  “Planet e menaxhimit, interpretimit dhe eksperienca e vizitorëve...</p>
<p>The post <a href="https://www.albaniandf.org/en/2020/11/09/planet-e-menaxhimit-interpretimit-dhe-eksperienca-e-vizitoreve-per-zonen-turistike-zvernec-narte-ujerat-termale-benje-permet/">Planet e menaxhimit, interpretimit dhe eksperienca e vizitorëve për zonën turistike Zvërnec Nartë/Ujërat Termale, Bënjë-Permet</a> appeared first on <a href="https://www.albaniandf.org/en/">Fondi Shqiptar i Zhvillimit</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>FTESË PËR OFERTË</strong></p>
<p>&nbsp;</p>
<p><strong>SHQIPËRI</strong></p>
<p><strong>Projekti për Integrimin Urban dhe Zhvillimin e Turizmit</strong></p>
<p><strong>Hua nga IBRD:  Nr. 8656- ALB</strong></p>
<p><strong>Titulli i Kontratës:  </strong><strong>“</strong><strong>Planet e menaxhimit, interpretimit dhe eksperienca e vizitorëve për zonën turistike Zvërnec Nartë/Ujërat Termale, Bënjë-Permet&#8221;</strong></p>
<p><strong>Referencë:</strong>  <strong>FSHZH/ PIUTD/AL-ADF-203245-CW-RFB</strong></p>
<p><strong>Leshuar ne Daten:  09 Nëntor 2020</strong></p>
<p>&nbsp;</p>
<ol>
<li>Qeveria e <em>Shqiperise ka marrë nje </em>financim nga Banka Botërore kundrejt kostos së Projektit “<strong>Integrimi Urban dhe Zhvillimi i Turizmit”</strong>, dhe ka për qëllim të përdor pjesë të këtij financimi per  kontratën <strong>“Planet e menaxhimit, interpretimit dhe eksperienca e vizitorëve për zonën turistike Zvërnec Nartë/Ujërat Termale, Bënjë-Permet&#8221;.</strong></li>
</ol>
<p>&nbsp;</p>
<ol start="2">
<li>Fondi Shqiptar i fton tani ofertues të kualifikuar për te paraqitur ofertat e tyre per punimet civle <strong>“Planet e menaxhimit, interpretimit dhe eksperienca e vizitorëve për zonën turistike Zvërnec Nartë/Ujërat Termale, Bënjë-Permet&#8221;,</strong> qe parashikohen te kryhen per nje periudhe kohore prej <strong>11 muajsh</strong>.</li>
</ol>
<p>&nbsp;</p>
<ol start="3">
<li>Tenderi do të zhvillohet ne baze te nje dokumentacioni te harmonizuar ndermjet dokumentacionit per prokurimin e tenderit te hapur sipas Agjensise se Prokurimit Publik dhe standarteve te Bankes Boterore, duke u realizuar sipas procedurave te percaktuara ne udhezuesit e Bankës Botërore per : “<em><u>Prokurimi i Mallrave, Punët dhe Shërbimet Jo-Konsultuese nën Huatë IBRD dhe Kreditë IDA &amp;Grantet nga Huamarrësit e Bankës Botëror” (Janar 2011, rishikuar Korrik 2014). </u></em></li>
</ol>
<p>Ju lutemi referojuni paragrafeve 1.6 dhe 1.7 për politikat e Bankës Botërore (January 2011, revised July 2014)për konfliktin e interesit.</p>
<ol start="4">
<li>Ofertuesit/ kompanite e interesuar mund të marrin informacion me të detajuar nga <strong>Fondi Shqiptar i Zhvillimit (FSHZH) </strong>dhe të kontrollojnë dokumentat e tenderimit gjatë orareve zyrtare <em>nga 09:00 deri 16:30,  </em>në adresën e dhënë më poshtë:</li>
</ol>
<p>&nbsp;</p>
<p>Name                                <strong>Fondi Shqiptar i Zhvillimit (FSHZH)</strong></p>
<p>Address                            <strong>Rruga :” Sami Frashëri”, Nr. 10, Tiranë</strong></p>
<p>Tel                                   <strong>+355 4 2235 597/8</strong></p>
<p>Fax                  <strong>               +355 4 2234 885</strong></p>
<p>E-mail                             <strong>aalikaj@albaniandf.org</strong></p>
<p>Adresa e Internetit:    <strong> <a href="https://www.albaniandf.org/en/">https://www.albaniandf.org</a></strong></p>
<p><strong> </strong></p>
<ol start="5">
<li>Një set i plotë i dokumentave të tenderimit në shqip mund të blihet nga ofertuesit e përshtatshëm të interesuar sipas paraqitjes të një aplikimi të shkruar në adresën e mëposhtme dhe sipas pagesës të një takse të pakthyeshme prej 15,000 ALL . Mënyra e pagesës do të jetë me transferte bankare ne favor te:</li>
</ol>
<p><strong> </strong></p>
<p><strong>Emri i llogarise: Fondi Shqiptar i Zhvillimit </strong><strong> </strong></p>
<p><strong>Emri i Bankes: Union Bank</strong></p>
<p><strong>Emertimi i llogarise: “Llogari Projekti ADF”</strong></p>
<p><strong>Numri i klientit: 285464</strong></p>
<p><strong>IBAN CODE: AL80 2141 1106 0111 2854 6403 0117  </strong></p>
<p>&nbsp;</p>
<ol start="6">
<li>Ofertat duhet të dërgohen në adresën e mëposhtme në ose para <strong>10 Dhjetor 2020</strong><em>, </em><strong>Ora: </strong><strong>13</strong><strong>:</strong><strong>00 (ora lokale)</strong><em>.</em> Ofertat elektronike <em>nuk do të</em> lejohen. Ofertat e vonuara do të refuzohen. Ofertat do të hapen publikisht në prezencë të përfaqësuesve të caktuar të ofertuesve dhe kujtdo që zgjedh të marre pjesë në adresën e mëposhtme në <strong>10 Dhjetor</strong><strong> 2020</strong><em>, </em> <strong>Ora: </strong><strong>13</strong><strong>:</strong><strong>00 (ora lokale)</strong>.</li>
<li>Të gjitha ofertat duhet të shoqërohen nga një sigurim oferte me vler<strong>e</strong>e <strong>1</strong><strong>,900,000 Lekë</strong> (<strong>nje milion e nenteqind mije, lek</strong>).</li>
</ol>
<p>&nbsp;</p>
<ol start="8">
<li>Adresa(at) e referuar më sipër është:</li>
</ol>
<p>&nbsp;</p>
<p>Name                               <strong>Fondi Shqiptar i Zhvillimit (FSHZH)</strong></p>
<p>Address                           <strong>Rruga :” Sami Frashëri”, Nr. 10, Tiranë</strong></p>
<p>Tel                                  <strong>+355 4 2235 597/8</strong></p>
<p>Fax                  <strong>              +355 4 2234 885</strong></p>
<p>E-mail                            <strong>aalikaj@albaniandf.org</strong></p>
<p>Adresa e Internetit:    <a href="https://www.albaniandf.org/en/"><strong>https://www.albaniandf.org</strong></a></p><p>The post <a href="https://www.albaniandf.org/en/2020/11/09/planet-e-menaxhimit-interpretimit-dhe-eksperienca-e-vizitoreve-per-zonen-turistike-zvernec-narte-ujerat-termale-benje-permet/">Planet e menaxhimit, interpretimit dhe eksperienca e vizitorëve për zonën turistike Zvërnec Nartë/Ujërat Termale, Bënjë-Permet</a> appeared first on <a href="https://www.albaniandf.org/en/">Fondi Shqiptar i Zhvillimit</a>.</p>
]]></content:encoded>
					
					<wfw:commentrss>https://www.albaniandf.org/en/2020/11/09/planet-e-menaxhimit-interpretimit-dhe-eksperienca-e-vizitoreve-per-zonen-turistike-zvernec-narte-ujerat-termale-benje-permet/feed/</wfw:commentrss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Publikimi i dokumentave te perditesuara te Kuadrit te Menaxhimit Mjedisor dhe Social dhe Kuadrit te Politikave te Risistemimit</title>
		<link>https://www.albaniandf.org/en/2020/08/10/publikimi-i-dokumentave-te-perditesuara-te-kuadrit-te-menaxhimit-mjedisor-dhe-social-dhe-kuadrit-te-politikave-te-risistemimit/</link>
					<comments>https://www.albaniandf.org/en/2020/08/10/publikimi-i-dokumentave-te-perditesuara-te-kuadrit-te-menaxhimit-mjedisor-dhe-social-dhe-kuadrit-te-politikave-te-risistemimit/#respond</comments>
		
		<dc:creator><![CDATA[admin-admin]]></dc:creator>
		<pubdate>Mon, 10 Aug 2020 13:50:37 +0000</pubdate>
				<category><![CDATA[Info & Lajme]]></category>
		<category><![CDATA[Publikime]]></category>
		<category><![CDATA[PIUTD]]></category>
		<guid ispermalink="false">https://www.albaniandf.org/?p=8447</guid>

					<description><![CDATA[<p>Qeveria e Shqipërisë përmes Ministrisë së Financave dhe Ekonomisë kërkon Financim shtesë (AF) nga Banka Ndërkombëtare për Rindërtim dhe Zhvillim (Banka) për të mbështetur shkallën e ngritur për Projektin aktual...</p>
<p>The post <a href="https://www.albaniandf.org/en/2020/08/10/publikimi-i-dokumentave-te-perditesuara-te-kuadrit-te-menaxhimit-mjedisor-dhe-social-dhe-kuadrit-te-politikave-te-risistemimit/">Publikimi i dokumentave te perditesuara te Kuadrit te Menaxhimit Mjedisor dhe Social dhe Kuadrit te Politikave te Risistemimit</a> appeared first on <a href="https://www.albaniandf.org/en/">Fondi Shqiptar i Zhvillimit</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The Government of Albania through the Ministry of Finance and Economy seeks Additional Funding (AF) from the International Bank for Reconstruction and Development (the Bank)  to support the scale up for the current Project for Integrated Urban and Tourism Development (PIUTD) to finance integrated urban and tourism development and to expand the tourism market and  product development in new locations in the south Albania. The scale-up investments will be focused on Ksamil and Orikum, both of which are connected to the municipalities participating in the parent Project. The AF has necessitated updating the ESMF report to cover the expanded scope.</p>
<p>The AF will be used to support scale-up of investments on urban upgrading and infrastructure improvement into two new locations in the south of Albania, namely Ksamil and Orikum, which are closely connected to the municipalities and tourism sites supported by the parent Project. The indicative additional investments in these municipalities will fit the current scope of Component 1 under the parent Project and are similar to the ongoing investments under Component 1 of the Project, including a combination of upgrading of vehicular, pedestrian and multimodal accesses to the city and tourism attractions, strengthening of pedestrian connections and trails systems, integrated street upgrading, upgrading of recreational areas/parks and adaptive reuse of selected structures.</p>
<p>The AF will also be used to support municipalities to adapt to changing market conditions (related to COVID-19) in both the promotion (more targeted) and presentation (considerations of social and physical distancing, personal protective equipment (PPE) requirements, contactless entry and exit to tourist sites, etc. ) of tourism experiences.  Ksamil and Orikum, the two new locations, are closely connected to the municipalities supported by the parent project. The indicative additional activities in these municipalities will fit the current scope of Component 3 under the parent Project and are similar to the ongoing investments under Component 3, including development of new tourism products, adding value to existing products, strengthening tourism value chains, adapting to COVID-19 protocols, and targeting  and connecting products to markets.</p>
<p>AF consists of:</p>
<ol>
<li>Improved urban landscape through the implementation of urban regeneration activities in primary and specialized urban centers:</li>
<li>Improved quality of municipal infrastructure and services (i.e. increased hours per day of piped water delivery, improved sidewalks-street lighting and increased access to all-season roads);</li>
<li>Improved quality of supporting infrastructure in selected touristic sites;</li>
<li>Increased number of tourists visiting selected primary and specialized centers, increased levels of private sector investment in goods and service providers in an around those primary and specialized centers, increased expenditure and length of stay by visitors;</li>
<li>Increased capacity of municipality, tourism agencies and key government institutions to plan, manage and promote growth and investment in tourism related services.</li>
</ol>
<p>&nbsp;</p>
<p>The AF has necessitated the updating of Environmental and Social Management Framework (ESMF) and also the Resettlement Policy Framework (RPF) to cover the expanded scope of PIUTD Project.</p>
<p>Download Documents:</p>
<p><img data-recalc-dims="1" decoding="async" loading="lazy" class="alignleft wp-image-5108" src="https://i0.wp.com/www.albaniandf.org/wp-content/uploads/2019/05/pdf.png?resize=28%2C28&#038;ssl=1" alt="" width="28" height="28" srcset="https://i0.wp.com/www.albaniandf.org/wp-content/uploads/2019/05/pdf.png?resize=150%2C150&amp;ssl=1 150w, https://i0.wp.com/www.albaniandf.org/wp-content/uploads/2019/05/pdf.png?resize=300%2C300&amp;ssl=1 300w, https://i0.wp.com/www.albaniandf.org/wp-content/uploads/2019/05/pdf.png?w=512&amp;ssl=1 512w" sizes="auto, (max-width: 28px) 100vw, 28px" /><a href="https://www.albaniandf.org/wp-content/uploads/2020/10/PIUTD_Revised-RPF-submitted-for-Banks-review_revised.pdf" target="_blank" rel="noopener noreferrer">PIUTD_Revised RPF submitted for Bank's review_revised</a></p>
<p>&nbsp;</p>
<p><img data-recalc-dims="1" decoding="async" loading="lazy" class="alignleft wp-image-5108" src="https://i0.wp.com/www.albaniandf.org/wp-content/uploads/2019/05/pdf.png?resize=28%2C28&#038;ssl=1" alt="" width="28" height="28" srcset="https://i0.wp.com/www.albaniandf.org/wp-content/uploads/2019/05/pdf.png?resize=150%2C150&amp;ssl=1 150w, https://i0.wp.com/www.albaniandf.org/wp-content/uploads/2019/05/pdf.png?resize=300%2C300&amp;ssl=1 300w, https://i0.wp.com/www.albaniandf.org/wp-content/uploads/2019/05/pdf.png?w=512&amp;ssl=1 512w" sizes="auto, (max-width: 28px) 100vw, 28px" /><a href="https://www.albaniandf.org/wp-content/uploads/2020/08/ESMF_SFG2276-English-REVISED-Version04Aug20v6_Clean_revised.pdf" target="_blank" rel="noopener noreferrer">Environmental and Social Management Framework</a></p><p>The post <a href="https://www.albaniandf.org/en/2020/08/10/publikimi-i-dokumentave-te-perditesuara-te-kuadrit-te-menaxhimit-mjedisor-dhe-social-dhe-kuadrit-te-politikave-te-risistemimit/">Publikimi i dokumentave te perditesuara te Kuadrit te Menaxhimit Mjedisor dhe Social dhe Kuadrit te Politikave te Risistemimit</a> appeared first on <a href="https://www.albaniandf.org/en/">Fondi Shqiptar i Zhvillimit</a>.</p>
]]></content:encoded>
					
					<wfw:commentrss>https://www.albaniandf.org/en/2020/08/10/publikimi-i-dokumentave-te-perditesuara-te-kuadrit-te-menaxhimit-mjedisor-dhe-social-dhe-kuadrit-te-politikave-te-risistemimit/feed/</wfw:commentrss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>CONTRACT AWARD NOTICE</title>
		<link>https://www.albaniandf.org/en/2018/10/10/contract-award-notice-3/</link>
					<comments>https://www.albaniandf.org/en/2018/10/10/contract-award-notice-3/#respond</comments>
		
		<dc:creator><![CDATA[Artur Zaja]]></dc:creator>
		<pubdate>Wed, 10 Oct 2018 12:33:29 +0000</pubdate>
				<category><![CDATA[Prokurime]]></category>
		<category><![CDATA[Punime Civile]]></category>
		<category><![CDATA[PIUTD]]></category>
		<guid ispermalink="false">https://www.albaniandf.org//?p=3776</guid>

					<description><![CDATA[<p>CONTRACT AWARD NOTICE   Project Name: “Upgrading of vehicle access road Muzak Topia to Berat castle”, Ref. No.: AL – ADF – 15545 – CW – RFB   Name of...</p>
<p>The post <a href="https://www.albaniandf.org/en/2018/10/10/contract-award-notice-3/">CONTRACT AWARD NOTICE</a> appeared first on <a href="https://www.albaniandf.org/en/">Fondi Shqiptar i Zhvillimit</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>CONTRACT AWARD NOTICE </strong></p>
<p><strong> </strong></p>
<p><strong>Project Name: “Upgrading of vehicle access road Muzak Topia to Berat castle</strong><strong>”, </strong><strong>Ref. No.: AL – ADF – 15545 – CW – RFB</strong></p>
<p><strong> </strong></p>
<ul>
<li><strong>Name of each tenderer who submitted a Tender</strong></li>
</ul>
<p>&nbsp;</p>
<ol>
<li>“Eurokos” sh.p.k.</li>
<li>“Salillari” sh.p.k.</li>
<li>JV “Albakonstruksion” sh.p.k. &amp; “Karl Gega” sh.p.k.</li>
<li>JV “GPG Kompany” sh.p.k. &amp; “AD – Star”</li>
</ol>
<p>&nbsp;</p>
<ul>
<li><strong>Tender price as read out at Tender Opening</strong></li>
</ul>
<p>&nbsp;</p>
<ol>
<li>“Eurokos” sh.p.k. – 299,960,703 ALL</li>
<li>“Salillari” sh.p.k. – 303,380,910 ALL</li>
<li>JV “Albakonstruksion” sh.p.k. &amp; “Karl Gega” sh.p.k. – 334,224,828 ALL</li>
<li>JV “GPG Kompany” sh.p.k. &amp; “AD – Star” – 308,768, 040 ALL</li>
</ol>
<p>&nbsp;</p>
<ul>
<li><strong>Name and evaluated prices of the each Tender that was evaluated </strong></li>
</ul>
<p>&nbsp;</p>
<ol>
<li>“Eurokos” sh.p.k. – 299,960,703 ALL</li>
<li>“Salillari” sh.p.k. – 303,380,910 ALL</li>
<li>JV “GPG Kompany” sh.p.k. &amp; “AD – Star” – 308,768, 040 ALL</li>
<li>JV “Albakonstruksion” sh.p.k. &amp; “Karl Gega” sh.p.k. – 334,224,828 ALL</li>
</ol>
<p>&nbsp;</p>
<ul>
<li><strong>Number of tenderers whose Tenderers were rejected:</strong></li>
</ul>
<p>&nbsp;</p>
<p>None</p>
<p>&nbsp;</p>
<ul>
<li><strong>Wining Tenderer: “Eurokos” sh.p.k.</strong></li>
</ul>
<p>Bulevardi Zogu I, Godina Nr. 2, Ap. 7, Shk. 1, Kt. 3, Tirane, Albania</p>
<p><strong> </strong></p>
<p><strong>              Contract Price: </strong><strong>2</strong>99,960,703 ALL</p>
<p>&nbsp;</p>
<p><strong> Scope of Contract: </strong>“Upgrading of vehicle access road Muzak Topia to Berat castle”.    The estimated contract duration will be 12 months.</p><p>The post <a href="https://www.albaniandf.org/en/2018/10/10/contract-award-notice-3/">CONTRACT AWARD NOTICE</a> appeared first on <a href="https://www.albaniandf.org/en/">Fondi Shqiptar i Zhvillimit</a>.</p>
]]></content:encoded>
					
					<wfw:commentrss>https://www.albaniandf.org/en/2018/10/10/contract-award-notice-3/feed/</wfw:commentrss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>CONTRACT AWARD NOTICE</title>
		<link>https://www.albaniandf.org/en/2018/10/02/contract-award-notice/</link>
					<comments>https://www.albaniandf.org/en/2018/10/02/contract-award-notice/#respond</comments>
		
		<dc:creator><![CDATA[Artur Zaja]]></dc:creator>
		<pubdate>Tue, 02 Oct 2018 09:17:26 +0000</pubdate>
				<category><![CDATA[Shërbime]]></category>
		<category><![CDATA[Tenderat Fitues]]></category>
		<category><![CDATA[PIUTD]]></category>
		<guid ispermalink="false">https://www.albaniandf.org//?p=3753</guid>

					<description><![CDATA[<p>CONTRACT AWARD NOTICE   Reference code &#160; Contract No: AL-ADF-39736-CS-QCBS   Country: Albania   Sector: Tourism Development   Project Title: Project for Integrated Urban and Tourism Development -PIUTD   Assignment...</p>
<p>The post <a href="https://www.albaniandf.org/en/2018/10/02/contract-award-notice/">CONTRACT AWARD NOTICE</a> appeared first on <a href="https://www.albaniandf.org/en/">Fondi Shqiptar i Zhvillimit</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p style="text-align: center;"><strong>CONTRACT AWARD NOTICE</strong></p>
<p><strong> </strong></p>
<ol>
<li><strong> Reference code</strong></li>
</ol>
<p>&nbsp;</p>
<ol start="2">
<li>Contract No:<strong> AL-ADF-39736-CS-QCBS</strong></li>
</ol>
<p><strong> </strong></p>
<ol start="3">
<li><strong> Country:</strong> Albania</li>
</ol>
<p><strong> </strong></p>
<ol start="4">
<li><strong> Sector: </strong>Tourism Development</li>
</ol>
<p><strong> </strong></p>
<ol start="5">
<li><strong> Project Title:</strong> Project for Integrated Urban and Tourism Development -PIUTD</li>
</ol>
<p><strong> </strong></p>
<ol start="6">
<li><strong> Assignment Title:</strong> <strong>“</strong><strong>Municipality of Gjirokastra – Concept, Detail Designs and Supervision for Integrated Urban Upgrading</strong><strong>”</strong></li>
</ol>
<p>&nbsp;</p>
<ol start="6">
<li><strong> Executing Agency:</strong> Albanian Development Fund</li>
</ol>
<p><strong> </strong></p>
<ol start="7">
<li><strong> Publication date of the procurement notice: </strong>19 November 2017</li>
</ol>
<p><strong> </strong></p>
<ol start="8">
<li><strong> Number of tenders that has submitted Expression of Interest: </strong>16</li>
</ol>
<p><strong> </strong></p>
<table class="mtr-table mtr-tr-td">
<tbody>
<tr>
<td width="43" data-mtr-content=" No. " class="mtr-td-tag"><div class="mtr-cell-content"><strong> </strong>
<p><strong>No.</strong></p>
<p><strong> </strong></p></div></td>
<td width="348" data-mtr-content=" Name of the Consulting firms " class="mtr-td-tag"><div class="mtr-cell-content"><strong> </strong>
<p><strong>Name of the Consulting firms</strong></p>
<p><strong> </strong></p></div></td>
<td width="247" data-mtr-content=" Country " class="mtr-td-tag"><div class="mtr-cell-content"><strong> </strong>
<p><strong>Country</strong></p>
<p><strong> </strong></p></div></td>
</tr>
<tr>
<td width="43" data-mtr-content=" No. " class="mtr-td-tag"><div class="mtr-cell-content">1</div></td>
<td width="348" data-mtr-content=" Name of the Consulting firms " class="mtr-td-tag"><div class="mtr-cell-content">Consortium Atelier 4 ltd &amp; Keios Srl Development Consulting</div></td>
<td width="247" data-mtr-content=" Country " class="mtr-td-tag"><div class="mtr-cell-content">Albania/Italy</div></td>
</tr>
<tr>
<td width="43" data-mtr-content=" No. " class="mtr-td-tag"><div class="mtr-cell-content">2</div></td>
<td width="348" data-mtr-content=" Name of the Consulting firms " class="mtr-td-tag"><div class="mtr-cell-content">Gaia S.A. Meleton</div></td>
<td width="247" data-mtr-content=" Country " class="mtr-td-tag"><div class="mtr-cell-content">Greece</div></td>
</tr>
<tr>
<td width="43" data-mtr-content=" No. " class="mtr-td-tag"><div class="mtr-cell-content">3</div></td>
<td width="348" data-mtr-content=" Name of the Consulting firms " class="mtr-td-tag"><div class="mtr-cell-content">JV “Bernard Ingenieure ZT” GmbH &amp; “Austria Rail Engineering (ARE)” GmbH &amp; “G+AProjekt” sh.p.k.</div></td>
<td width="247" data-mtr-content=" Country " class="mtr-td-tag"><div class="mtr-cell-content">Austria/Austria/Albania</div></td>
</tr>
<tr>
<td width="43" data-mtr-content=" No. " class="mtr-td-tag"><div class="mtr-cell-content">4</div></td>
<td width="348" data-mtr-content=" Name of the Consulting firms " class="mtr-td-tag"><div class="mtr-cell-content">JV ARS Proggeti s.p.a. &amp; 3TI Proggeti s.p.a. &amp; Cultural Heritage without Borders Albania</div></td>
<td width="247" data-mtr-content=" Country " class="mtr-td-tag"><div class="mtr-cell-content">Italy/Italy/Albania</div></td>
</tr>
<tr>
<td width="43" data-mtr-content=" No. " class="mtr-td-tag"><div class="mtr-cell-content">5</div></td>
<td width="348" data-mtr-content=" Name of the Consulting firms " class="mtr-td-tag"><div class="mtr-cell-content">“Anaplasi Consulting Engineers” s.a. &amp; “Local Partner Edi Como Studio”</div></td>
<td width="247" data-mtr-content=" Country " class="mtr-td-tag"><div class="mtr-cell-content">Greece/Albania</div></td>
</tr>
<tr>
<td width="43" data-mtr-content=" No. " class="mtr-td-tag"><div class="mtr-cell-content">6</div></td>
<td width="348" data-mtr-content=" Name of the Consulting firms " class="mtr-td-tag"><div class="mtr-cell-content">JV Ingegneri Riuniti SpA &amp; Dr. Weissgerber &amp; Partners sh.p.k. &amp; Rossiprodi Associati &amp; Studio martini Ingegneria S.r.l.</div></td>
<td width="247" data-mtr-content=" Country " class="mtr-td-tag"><div class="mtr-cell-content">Italy/Albania/Italy/Italy</div></td>
</tr>
<tr>
<td width="43" data-mtr-content=" No. " class="mtr-td-tag"><div class="mtr-cell-content">7</div></td>
<td width="348" data-mtr-content=" Name of the Consulting firms " class="mtr-td-tag"><div class="mtr-cell-content">JV Abkons ltd &amp; Arub Italiasrl</div></td>
<td width="247" data-mtr-content=" Country " class="mtr-td-tag"><div class="mtr-cell-content">Albania/Italy</div></td>
</tr>
<tr>
<td width="43" data-mtr-content=" No. " class="mtr-td-tag"><div class="mtr-cell-content">8</div></td>
<td width="348" data-mtr-content=" Name of the Consulting firms " class="mtr-td-tag"><div class="mtr-cell-content">JV Institut  IGH d.d. &amp; Urban Planning Institute of Croatia (UH) d.o.o &amp; Taulant ltd</div></td>
<td width="247" data-mtr-content=" Country " class="mtr-td-tag"><div class="mtr-cell-content">Croatia/Croatia/Albania</div></td>
</tr>
<tr>
<td width="43" data-mtr-content=" No. " class="mtr-td-tag"><div class="mtr-cell-content">9</div></td>
<td width="348" data-mtr-content=" Name of the Consulting firms " class="mtr-td-tag"><div class="mtr-cell-content">Association Roikos Engineering Consultant s.a. &amp; ASPA Urban Environmental Reformations SA</div></td>
<td width="247" data-mtr-content=" Country " class="mtr-td-tag"><div class="mtr-cell-content">Greece/Greece</div></td>
</tr>
<tr>
<td width="43" data-mtr-content=" No. " class="mtr-td-tag"><div class="mtr-cell-content">10</div></td>
<td width="348" data-mtr-content=" Name of the Consulting firms " class="mtr-td-tag"><div class="mtr-cell-content">Association Archidata s.r.l<strong>.</strong> &amp; IP3 &amp; D&amp;C Partners &amp; MIC Mobility chain &amp; Stefano Boeri Architetti</div></td>
<td width="247" data-mtr-content=" Country " class="mtr-td-tag"><div class="mtr-cell-content">Italy/Albania/Albania/Italy/Italy</div></td>
</tr>
<tr>
<td width="43" data-mtr-content=" No. " class="mtr-td-tag"><div class="mtr-cell-content">11</div></td>
<td width="348" data-mtr-content=" Name of the Consulting firms " class="mtr-td-tag"><div class="mtr-cell-content">Gjeokonsult &amp; Co</div></td>
<td width="247" data-mtr-content=" Country " class="mtr-td-tag"><div class="mtr-cell-content">Albania</div></td>
</tr>
<tr>
<td width="43" data-mtr-content=" No. " class="mtr-td-tag"><div class="mtr-cell-content">12</div></td>
<td width="348" data-mtr-content=" Name of the Consulting firms " class="mtr-td-tag"><div class="mtr-cell-content">A &amp; E sh.p.k.</div></td>
<td width="247" data-mtr-content=" Country " class="mtr-td-tag"><div class="mtr-cell-content">Albania</div></td>
</tr>
<tr>
<td width="43" data-mtr-content=" No. " class="mtr-td-tag"><div class="mtr-cell-content">13</div></td>
<td width="348" data-mtr-content=" Name of the Consulting firms " class="mtr-td-tag"><div class="mtr-cell-content">CEC Group l.t.d</div></td>
<td width="247" data-mtr-content=" Country " class="mtr-td-tag"><div class="mtr-cell-content">Albania</div></td>
</tr>
<tr>
<td width="43" data-mtr-content=" No. " class="mtr-td-tag"><div class="mtr-cell-content">14</div></td>
<td width="348" data-mtr-content=" Name of the Consulting firms " class="mtr-td-tag"><div class="mtr-cell-content">Consortium Arriola &amp; Fiol Arquitectes &amp; Studio B&amp;L &amp; iCConsulenten &amp; DOYMO</div></td>
<td width="247" data-mtr-content=" Country " class="mtr-td-tag"><div class="mtr-cell-content">Spain/Albania/Albania/Spain</div></td>
</tr>
<tr>
<td width="43" data-mtr-content=" No. " class="mtr-td-tag"><div class="mtr-cell-content">15</div></td>
<td width="348" data-mtr-content=" Name of the Consulting firms " class="mtr-td-tag"><div class="mtr-cell-content">JV Bolles+Willson GmbH &amp; Co. KG &amp; Studio Schultz-Granberg – Urban Design and Spatial Strategies &amp; KemmingLandschaftsarchitektur &amp; Thomas &amp; BokampIngenieurgesellschaft GmbH &amp; Giovanni Damiani s.r.l. &amp; Job Project l.t.d.</div></td>
<td width="247" data-mtr-content=" Country " class="mtr-td-tag"><div class="mtr-cell-content">Germany/Germany/Germany/Germany/Italy/Albania</div></td>
</tr>
<tr>
<td width="43" data-mtr-content=" No. " class="mtr-td-tag"><div class="mtr-cell-content">16</div></td>
<td width="348" data-mtr-content=" Name of the Consulting firms " class="mtr-td-tag"><div class="mtr-cell-content">JV C+S Associati &amp; Son Engineering and Construction</div></td>
<td width="247" data-mtr-content=" Country " class="mtr-td-tag"><div class="mtr-cell-content">Italy/Albania</div></td>
</tr>
</tbody>
</table>
<p>&nbsp;</p>
<ol start="9">
<li><strong> Number of tender that has been shortlisted: </strong>6</li>
</ol>
<p><strong> </strong></p>
<ol>
<li>JV “Institut IGH” d.d. &amp; “Urban Planning Institute of Croatia (UH)” d.o.o &amp; “Taulant” ltd</li>
</ol>
<p>&nbsp;</p>
<ol start="2">
<li>Association “Archidata” s.r.l<strong>. </strong>&amp; “IP3” &amp; “D&amp;C Partners” &amp; “MIC Mobilitychain” &amp; “Stefano Boeri Architetti”</li>
</ol>
<p>&nbsp;</p>
<ol start="3">
<li>JV “ARS Proggeti” s.p.a. &amp; “3TI Proggeti” s.p.a. &amp; “Cultural Heritage without Borders Albania”</li>
</ol>
<p>&nbsp;</p>
<ol start="4">
<li>Consortium “Arriola &amp; Fiol Arquitectes” &amp; “Studio B&amp;L” &amp; “iC Consulenten” &amp; “DOYMO”</li>
</ol>
<p>&nbsp;</p>
<ol start="5">
<li>Consortium “Atelier 4” ltd &amp; “Keios” srl &amp; “Development Consulting”</li>
</ol>
<p>&nbsp;</p>
<ol start="6">
<li>&#8220;Anaplasi Consulting Engineers&#8221; s.a. &amp; &#8220;Local Partner Edi Como Studio&#8221;</li>
</ol>
<p><strong> </strong></p>
<ol start="10">
<li><strong> Number of tenders that has submitted Request for Proposal: 5</strong></li>
</ol>
<p>&nbsp;</p>
<ol>
<li>JV “Institut IGH” d.d. &amp; “Urban Planning Institute of Croatia (UH)” d.o.o &amp; “Taulant” ltd – 84, 25 points</li>
</ol>
<p>&nbsp;</p>
<ol start="2">
<li>Association “Archidata” s.r.l<strong>. </strong>&amp; “IP3” &amp; “D&amp;C Partners” &amp; “MIC Mobilitychain” &amp; “Stefano Boeri Architetti” – 96, 59 points</li>
</ol>
<p>&nbsp;</p>
<ol start="3">
<li>JV “ARS Proggeti” s.p.a. &amp; “3TI Proggeti” s.p.a. &amp; “Cultural Heritage without Borders Albania” – 90, 84 points</li>
</ol>
<p>&nbsp;</p>
<ol start="4">
<li>Consortium “Arriola &amp; Fiol Arquitectes” &amp; “Studio B&amp;L” &amp; “iC Consulenten” &amp; “DOYMO” – 78, 57 points</li>
</ol>
<p>&nbsp;</p>
<ol start="5">
<li>&#8220;Anaplasi Consulting Engineers&#8221; s.a. &amp; &#8220;Local Partner Edi Como Studio&#8221; – 72, 88 points</li>
</ol>
<p>&nbsp;</p>
<ol start="11">
<li><strong> Financial prices as read out:</strong></li>
</ol>
<p><strong> </strong></p>
<ol>
<li>JV “Institut IGH” d.d. &amp; “Urban Planning Institute of Croatia (UH)” d.o.o &amp; “Taulant” ltd – 404,206.50 Euro (VAT Excl)</li>
</ol>
<p>&nbsp;</p>
<ol start="2">
<li>Association “Archidata” s.r.l<strong>. </strong>&amp; “IP3” &amp; “D&amp;C Partners” &amp; “MIC Mobilitychain” &amp; “Stefano Boeri Architetti” – 845,815 Euro (including indirect taxes)</li>
</ol>
<p>&nbsp;</p>
<ol start="3">
<li>JV “ARS Proggeti” s.p.a. &amp; “3TI Proggeti” s.p.a. &amp; “Cultural Heritage without Borders Albania” – 656,800 Euro (VAT Excl)</li>
</ol>
<p>&nbsp;</p>
<p>&nbsp;</p>
<ol start="4">
<li>Consortium “Arriola &amp; Fiol Arquitectes” &amp; “Studio B&amp;L” &amp; “iC Consulenten” &amp; “DOYMO” – 846,363.98 Euro</li>
</ol>
<p>&nbsp;</p>
<ol start="12">
<li><strong> Financial prices after evaluation </strong></li>
</ol>
<p>&nbsp;</p>
<ol>
<li>JV “Institut IGH” d.d. &amp; “Urban Planning Institute of Croatia (UH)” d.o.o &amp; “Taulant” ltd – 403,873.5 Euro (VAT Excl)</li>
</ol>
<p>&nbsp;</p>
<ol start="2">
<li>Association “Archidata” s.r.l<strong>. </strong>&amp; “IP3” &amp; “D&amp;C Partners” &amp; “MIC Mobilitychain” &amp; “Stefano Boeri Architetti” – 845,815 Euro (including indirect taxes)</li>
</ol>
<p>&nbsp;</p>
<ol start="3">
<li>JV “ARS Proggeti” s.p.a. &amp; “3TI Proggeti” s.p.a. &amp; “Cultural Heritage without Borders Albania” – 656,800 Euro (VAT Excl)</li>
</ol>
<p>&nbsp;</p>
<ol start="4">
<li>Consortium “Arriola &amp; Fiol Arquitectes” &amp; “Studio B&amp;L” &amp; “iC Consulenten” &amp; “DOYMO” – 846,363.98 Euro</li>
</ol>
<p><strong> </strong></p>
<ol start="13">
<li><strong> The final combined score</strong></li>
</ol>
<p>&nbsp;</p>
<table width="737" class="mtr-table mtr-tr-td">
<tbody>
<tr>
<td width="42" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content"><strong>No.</strong></div></td>
<td width="186" data-mtr-content="Consultants’ names" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Consultants’ names</strong></div></td>
<td width="78" data-mtr-content="Technical scores" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Technical scores</strong></div></td>
<td width="98" data-mtr-content="Technical Points" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Technical Points</strong></div></td>
<td width="98" data-mtr-content="Financial Proposed amount (excluding indirect taxes)" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Financial Proposed amount (excluding indirect taxes)</strong></div></td>
<td width="73" data-mtr-content="Financial scores" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Financial scores</strong></div></td>
<td width="66" data-mtr-content="Financial point" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Financial point</strong></div></td>
<td width="96" data-mtr-content="Final scores point" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Final scores point</strong></div></td>
</tr>
<tr>
<td width="42" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">1</div></td>
<td width="186" data-mtr-content="Consultants’ names" class="mtr-td-tag"><div class="mtr-cell-content">JV. Institut IGH d.d. &amp; Urban Planning Institute of Croatia (UH) d.o.o &amp; Taulant  ltd</div></td>
<td width="78" data-mtr-content="Technical scores" class="mtr-td-tag"><div class="mtr-cell-content">84.25</div></td>
<td width="98" data-mtr-content="Technical Points" class="mtr-td-tag"><div class="mtr-cell-content">67.40</div></td>
<td width="98" data-mtr-content="Financial Proposed amount (excluding indirect taxes)" class="mtr-td-tag"><div class="mtr-cell-content">€ 403,873.5</div></td>
<td width="73" data-mtr-content="Financial scores" class="mtr-td-tag"><div class="mtr-cell-content">100.0</div></td>
<td width="66" data-mtr-content="Financial point" class="mtr-td-tag"><div class="mtr-cell-content">20</div></td>
<td width="96" data-mtr-content="Final scores point" class="mtr-td-tag"><div class="mtr-cell-content"><strong>87.40</strong></div></td>
</tr>
<tr>
<td width="42" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">2</div></td>
<td width="186" data-mtr-content="Consultants’ names" class="mtr-td-tag"><div class="mtr-cell-content">Association “Archidata” s.r.l. &amp; “IP3” &amp; “D&amp;C Partners” &amp; “MIC Mobility chain” &amp; “Stefano Boeri Architetti”</div></td>
<td width="78" data-mtr-content="Technical scores" class="mtr-td-tag"><div class="mtr-cell-content">96.59</div></td>
<td width="98" data-mtr-content="Technical Points" class="mtr-td-tag"><div class="mtr-cell-content">77.27</div></td>
<td width="98" data-mtr-content="Financial Proposed amount (excluding indirect taxes)" class="mtr-td-tag"><div class="mtr-cell-content">€  845,815.00</div></td>
<td width="73" data-mtr-content="Financial scores" class="mtr-td-tag"><div class="mtr-cell-content"> 
<p>47.75</p></div></td>
<td width="66" data-mtr-content="Financial point" class="mtr-td-tag"><div class="mtr-cell-content">9.55</div></td>
<td width="96" data-mtr-content="Final scores point" class="mtr-td-tag"><div class="mtr-cell-content"><strong>86.82</strong></div></td>
</tr>
<tr>
<td width="42" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">3</div></td>
<td width="186" data-mtr-content="Consultants’ names" class="mtr-td-tag"><div class="mtr-cell-content">JV “ARS Proggeti” s.p.a. &amp; “3TI Proggeti” s.p.a. &amp; “Cultural Heritage without Borders Albania”</div></td>
<td width="78" data-mtr-content="Technical scores" class="mtr-td-tag"><div class="mtr-cell-content">90.84</div></td>
<td width="98" data-mtr-content="Technical Points" class="mtr-td-tag"><div class="mtr-cell-content">72.67</div></td>
<td width="98" data-mtr-content="Financial Proposed amount (excluding indirect taxes)" class="mtr-td-tag"><div class="mtr-cell-content">€ 656,800</div></td>
<td width="73" data-mtr-content="Financial scores" class="mtr-td-tag"><div class="mtr-cell-content">61.49</div></td>
<td width="66" data-mtr-content="Financial point" class="mtr-td-tag"><div class="mtr-cell-content">12.30</div></td>
<td width="96" data-mtr-content="Final scores point" class="mtr-td-tag"><div class="mtr-cell-content"><strong>84.97</strong></div></td>
</tr>
<tr>
<td width="42" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">4</div></td>
<td width="186" data-mtr-content="Consultants’ names" class="mtr-td-tag"><div class="mtr-cell-content">Consortium “Arriola &amp; Fiol Arquitectes” &amp; “Studio B&amp;L” &amp; ‘iC Consulenten” &amp; “DOYMO”</div></td>
<td width="78" data-mtr-content="Technical scores" class="mtr-td-tag"><div class="mtr-cell-content">78.57</div></td>
<td width="98" data-mtr-content="Technical Points" class="mtr-td-tag"><div class="mtr-cell-content">62.86</div></td>
<td width="98" data-mtr-content="Financial Proposed amount (excluding indirect taxes)" class="mtr-td-tag"><div class="mtr-cell-content">€ 846,363.98</div></td>
<td width="73" data-mtr-content="Financial scores" class="mtr-td-tag"><div class="mtr-cell-content"> 
<p>47.72</p></div></td>
<td width="66" data-mtr-content="Financial point" class="mtr-td-tag"><div class="mtr-cell-content"> 
<p>9.54</p></div></td>
<td width="96" data-mtr-content="Final scores point" class="mtr-td-tag"><div class="mtr-cell-content"><strong>72.40</strong></div></td>
</tr>
</tbody>
</table>
<p>&nbsp;</p>
<ol start="14">
<li><strong> Financial Offer of the chosen tenderer </strong></li>
</ol>
<p>&nbsp;</p>
<p>403,872.5 (VAT Excl)</p>
<p><strong> </strong></p>
<ol start="15">
<li><strong> Name, address and nationality of the successful tenderer</strong></li>
</ol>
<p>&nbsp;</p>
<p>JV “Institut IGH” d.d. &amp; “Urban Planning Institute of Croatia (UH)” d.o.o &amp; “Taulant” ltd – ADR Institut IGH d.d., Janka Rakuše 1, 10000 Zagreb, Croatia</p><p>The post <a href="https://www.albaniandf.org/en/2018/10/02/contract-award-notice/">CONTRACT AWARD NOTICE</a> appeared first on <a href="https://www.albaniandf.org/en/">Fondi Shqiptar i Zhvillimit</a>.</p>
]]></content:encoded>
					
					<wfw:commentrss>https://www.albaniandf.org/en/2018/10/02/contract-award-notice/feed/</wfw:commentrss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Rehabilitimi i rrugës “Muzak Topia” për në Kalanë e Beratit</title>
		<link>https://www.albaniandf.org/en/2018/09/17/rehabilitimi-i-rruges-muzak-topia/</link>
					<comments>https://www.albaniandf.org/en/2018/09/17/rehabilitimi-i-rruges-muzak-topia/#respond</comments>
		
		<dc:creator><![CDATA[admin-admin]]></dc:creator>
		<pubdate>Mon, 17 Sep 2018 13:52:59 +0000</pubdate>
				<category><![CDATA[Info & Lajme]]></category>
		<category><![CDATA[Publikime]]></category>
		<category><![CDATA[PIUTD]]></category>
		<guid ispermalink="false">https://www.albaniandf.org//?p=3681</guid>

					<description><![CDATA[<p>Ne vazhdim te Procedurave te kompensimit per personat e prekur nga Projekti: Rikonstruksioni dhe Zgjerimi I Rruges Muzak Topia –Berat (segmenti nga rreth rrotullimi te ish-rezervat e Shtetit deri tek...</p>
<p>The post <a href="https://www.albaniandf.org/en/2018/09/17/rehabilitimi-i-rruges-muzak-topia/">Rehabilitimi i rrugës “Muzak Topia” për në Kalanë e Beratit</a> appeared first on <a href="https://www.albaniandf.org/en/">Fondi Shqiptar i Zhvillimit</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Following the Compensation Procedures for Persons Affected by the Project(PAP): Reconstruction and Expansion of the Road Muzak Topia -Berat ( the segment from the roundabout at the former state reserves to the lapidary in Kala, as well as the segment from Lapidari to the church of St. Ilias) The ADF, after WB clearance, announces:</p>
<p><a href="https://www.albaniandf.org//wp-content/uploads/2018/10/RAP-clearance-Shqip-Berat-Muzak-Topia.pdf" target="_blank" rel="noopener">ARAP ( Abbreviate Resettlement  Action Plan) for Muzak Topia road – Download</a></p>
<p>The rehabilitation of “Muzak Topia” road to Berat Castle, part of the investments, implemented by the Albanian Development Fund under the project “Integrated Urban and Tourism Development” is funded by the World Bank through the Albanian Government and include the improvement of:</p>
<p>– Access to residential quarters through intervention at existing access points and crossings<br />
– Placement of walking paths with trees<br />
– Reconstruction of all elements of infrastructure such as (sewerage, drainage channels, etc.)<br />
– Parking for buses and private vehicles</p>
<p>&nbsp;</p>
<div id="divider-f8d0723df2ddbeff53ffd022d38fa4d3" class="sh-divider sh-divider-center sh-divider-content-none">
			<div class="sh-divider-line"></div>
	</div>
Rehabilitation of &#8220;Muzak Topia&#8221; road to Berat Castle</p>
<p>Following the Compensation Procedures for Persons Affected by the Project(PAP): Reconstruction and Expansion of the Road Muzak Topia -Berat (&nbsp;the segment from the roundabout at the former state reserves to the lapidary in Kala, as well as the segment from Lapidari to the church of St. Ilias) The ADF, after WB clearance, announces:</p>
<p><a href="https://www.albaniandf.org//wp-content/uploads/2018/10/RAP-clearance-English-Berat-Muzak-Topia.pdf" target="_blank" rel="noopener">ARAP ( Abbreviate Resettlement &nbsp;Action Plan) for Muzak Topia road &#8211; Download</a></p>
<p>The rehabilitation of “Muzak Topia” road to Berat Castle is part of the investments that are being implemented by the Albanian Development Fund under the project “Integrated Urban and Tourism Development”, funded by the World Bank through the Albanian Government and include the improvement of:</p>
<p>– Access to residential quarters through intervention at existing access points and crossings<br />
– Placement of walking paths with trees<br />
– Reconstruction of all elements of infrastructure such as (sewerage, drainage channels, etc.)<br />
– Parking for buses and private vehicles</p><p>The post <a href="https://www.albaniandf.org/en/2018/09/17/rehabilitimi-i-rruges-muzak-topia/">Rehabilitimi i rrugës “Muzak Topia” për në Kalanë e Beratit</a> appeared first on <a href="https://www.albaniandf.org/en/">Fondi Shqiptar i Zhvillimit</a>.</p>
]]></content:encoded>
					
					<wfw:commentrss>https://www.albaniandf.org/en/2018/09/17/rehabilitimi-i-rruges-muzak-topia/feed/</wfw:commentrss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>CONTRACT AWARD NOTICE FOR CONTRACT &#8220;Bazaar cobble stone roads rehabilitation in Gjirokastra&#8221;</title>
		<link>https://www.albaniandf.org/en/2018/09/14/contract-award-notice-for-contract-bazaar-cobble-stone-roads-rehabilitation-in-gjirokastra/</link>
					<comments>https://www.albaniandf.org/en/2018/09/14/contract-award-notice-for-contract-bazaar-cobble-stone-roads-rehabilitation-in-gjirokastra/#respond</comments>
		
		<dc:creator><![CDATA[Artur Zaja]]></dc:creator>
		<pubdate>Fri, 14 Sep 2018 09:26:38 +0000</pubdate>
				<category><![CDATA[Prokurime]]></category>
		<category><![CDATA[Tenderat Fitues]]></category>
		<category><![CDATA[PIUTD]]></category>
		<guid ispermalink="false">https://www.albaniandf.org/?p=3816</guid>

					<description><![CDATA[<p>Project Name: “Bazaar cobble stone roads rehabilitation in Gjirokastra”, Ref. No.: AL-ADF-62551-CW-RFB   Name of each tenderer who submitted a Tender &#160; JV “Sterkaj” sh.p.k. &#38; “Erla Construksion” sh.p.k. “Jogi”...</p>
<p>The post <a href="https://www.albaniandf.org/en/2018/09/14/contract-award-notice-for-contract-bazaar-cobble-stone-roads-rehabilitation-in-gjirokastra/">CONTRACT AWARD NOTICE FOR CONTRACT &#8220;Bazaar cobble stone roads rehabilitation in Gjirokastra&#8221;</a> appeared first on <a href="https://www.albaniandf.org/en/">Fondi Shqiptar i Zhvillimit</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>Project Name: “Bazaar cobble stone roads rehabilitation in Gjirokastra</strong><strong>”, </strong><strong>Ref. No.: </strong><strong>AL-ADF-62551-CW-RFB</strong></p>
<p><strong> </strong></p>
<ul>
<li><strong>Name of each tenderer who submitted a Tender</strong></li>
</ul>
<p>&nbsp;</p>
<ol>
<li>JV “Sterkaj” sh.p.k. &amp; “Erla Construksion” sh.p.k. “Jogi” sh.p.k.</li>
<li>JV “Leon Konstruksion” sh.p.k. &amp; “Hastoçi” sh.p.k.</li>
<li>JV “R &amp; T” &amp; “Albakonstruksion” sh.p.k.</li>
</ol>
<p>&nbsp;</p>
<ul>
<li><strong>Tender price as read out at Tender Opening</strong></li>
</ul>
<p>&nbsp;</p>
<ol>
<li>JV “Sterkaj” sh.p.k. &amp; “Erla Construksion” sh.p.k. “Jogi” sh.p.k. – 133,005,420 ALL</li>
<li>JV “Leon Konstruksion” sh.p.k. &amp; “Hastoçi” sh.p.k. – 137,778,274.98 ALL</li>
<li>JV “R &amp; T” &amp; “Albakonstruksion” sh.p.k. – 143,648,280.72 ALL</li>
</ol>
<p>&nbsp;</p>
<ol start="4">
<li><strong>Name and evaluated prices of the each Tender that was evaluated </strong></li>
</ol>
<p>&nbsp;</p>
<ol>
<li>JV “Sterkaj” sh.p.k. &amp; “Erla Construksion” sh.p.k. “Jogi” sh.p.k. – 133,005,420 ALL</li>
<li>JV “Leon Konstruksion” sh.p.k. &amp; “Hastoçi” sh.p.k. – 137,778,274.98 ALL</li>
<li>JV “R &amp; T” &amp; “Albakonstruksion” sh.p.k. – 143,648,280.72 ALL</li>
</ol>
<p>&nbsp;</p>
<ol start="4">
<li><strong>Number of tenderers whose Tenderers were rejected:</strong></li>
</ol>
<p>&nbsp;</p>
<p>None</p>
<p>&nbsp;</p>
<ol start="5">
<li><strong>Contractor: JV “Leon Konstruksion” sh.p.k. &amp; “Hastoçi” sh.p.k.</strong></li>
</ol>
<p>Bulevardi Zogu I, Godina Nr. 2, Ap. 7, Shk. 1, Kt. 3, Tirane, Albania</p>
<p><strong> </strong></p>
<p><strong>            Contract Price: </strong>137,778,274.98 ALL</p>
<p>&nbsp;</p>
<ol start="6">
<li><strong>Scope of Contract: </strong>“<strong>Bazaar cobble stone roads rehabilitation in Gjirokastra</strong>”. The estimated contract duration will be 12 months.</li>
</ol><p>The post <a href="https://www.albaniandf.org/en/2018/09/14/contract-award-notice-for-contract-bazaar-cobble-stone-roads-rehabilitation-in-gjirokastra/">CONTRACT AWARD NOTICE FOR CONTRACT &#8220;Bazaar cobble stone roads rehabilitation in Gjirokastra&#8221;</a> appeared first on <a href="https://www.albaniandf.org/en/">Fondi Shqiptar i Zhvillimit</a>.</p>
]]></content:encoded>
					
					<wfw:commentrss>https://www.albaniandf.org/en/2018/09/14/contract-award-notice-for-contract-bazaar-cobble-stone-roads-rehabilitation-in-gjirokastra/feed/</wfw:commentrss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Design and Supervision Gjirokastra System of Museums-Municipality of Gjirokastra”, Consulting Services</title>
		<link>https://www.albaniandf.org/en/2018/09/10/design-and-supervision-gjirokastra-system-of-museums-municipality-of-gjirokastra-consulting-services/</link>
					<comments>https://www.albaniandf.org/en/2018/09/10/design-and-supervision-gjirokastra-system-of-museums-municipality-of-gjirokastra-consulting-services/#respond</comments>
		
		<dc:creator><![CDATA[Artur Zaja]]></dc:creator>
		<pubdate>Mon, 10 Sep 2018 11:46:14 +0000</pubdate>
				<category><![CDATA[Prokurime]]></category>
		<category><![CDATA[PIUTD]]></category>
		<guid ispermalink="false">https://www.albaniandf.org//?p=3615</guid>

					<description><![CDATA[<p>REQUEST FOR EXPRESSIONS OF INTEREST (REOI)   (CONSULTING SERVICES)   Albania Albanian Development Fund (ADF) Project for Integrated Urban and Tourism Development (PIUTD) IBRD Loan No: 8656- ALB. Project ID...</p>
<p>The post <a href="https://www.albaniandf.org/en/2018/09/10/design-and-supervision-gjirokastra-system-of-museums-municipality-of-gjirokastra-consulting-services/">Design and Supervision Gjirokastra System of Museums-Municipality of Gjirokastra”, Consulting Services</a> appeared first on <a href="https://www.albaniandf.org/en/">Fondi Shqiptar i Zhvillimit</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>REQUEST FOR EXPRESSIONS OF INTEREST (REOI)</strong></p>
<p><strong> </strong></p>
<p><strong>(CONSULTING SERVICES)</strong></p>
<p><strong> </strong></p>
<p><strong>Albania</strong></p>
<p><strong>Albanian Development Fund (ADF)</strong></p>
<p><strong>Project for Integrated Urban and Tourism Development (PIUTD)</strong></p>
<p><strong>IBRD Loan No: 8656- ALB. </strong></p>
<p><strong>Project ID Number: P15562</strong></p>
<p><strong>Issuing date: September 11, 2018</strong></p>
<p><em> </em></p>
<p><em>Assignment Title:</em> <strong>“Design and Supervision Gjirokastra System of Museums-Municipality of Gjirokastra”, Consulting Services</strong></p>
<p><strong> </strong></p>
<p><em>Reference No.</em>         <strong>REF No: AL-ADF-15556-CS-CQS</strong></p>
<p>&nbsp;</p>
<p>The Government of Albania has received financing from the World Bank toward the cost of the <strong>Project for Integrated Urban and Tourism Development (PIUTD)</strong>, and intends to apply part of the proceeds for consulting services foressen under component 1 of this project.  The consulting services (“the Services”) include:<strong> “Design and Supervision Gjirokastra System of Museums-Municipality of Gjirokastra”.</strong></p>
<p>&nbsp;</p>
<p>The objective of this assignment is to design and supervise the implementation of a tourist-friendly System of Museums of Gjirokastra, defined by thematic interpretive pathways/trails connecting the different museums, enhanced by activities experience in the study area and to support the development of a tourism product (circuit of museums, thematic interpretive pathways/trails and activities) and encourage tourists to stay longer and have a more enlightening and interesting stay in Gjirokastra.</p>
<p><strong> </strong></p>
<p><strong>Albanian Development Fund (ADF)</strong>, now invites eligible consultants (“Consultants”) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. Consultants may associate with other firms in the form of a joint venture or a sub consultancy to enhance their qualifications.</p>
<p>&nbsp;</p>
<p>The consultant under this assignment is expected to provide its services for:</p>
<p><strong> </strong></p>
<p><strong>Phase A:</strong> Create a concept prioritize the intervention as well as design and interpretation business model’s preparation services.</p>
<p><strong> </strong></p>
<p><strong> </strong></p>
<p><strong> </strong></p>
<p><strong> </strong></p>
<p><strong>Phase B:</strong> Supervision Services</p>
<p>&nbsp;</p>
<ol>
<li>The activities for design services are expected to be performed through the following tasks:</li>
</ol>
<p>&nbsp;</p>
<p><strong>Task 1:</strong> Carry out a rapid desk-review, including stocktaking and preparation of a work-plan; and preparing the inception report;</p>
<p><strong>Task 2: </strong>Develop the System of Museum (SoMs) Concept, defining the tourism product;  the pathways, signage, interpretation, etc. between museums and identifying investment projects/activities around specific buildings or existing museums that enhance the value of the thematic interpretation to be financed under PIUTD.</p>
<p><strong>Task 3: </strong>Preliminary Concept Design, preliminary Estimates and Business Models for selected investment projects.</p>
<p><strong>Task 4:</strong> Prepare detailed designs, BoQs, technical specifications, technical reports, EIA reports, management plans and works schedule for selected investment projects to make them ready for bidding.</p>
<p>&nbsp;</p>
<ol>
<li>Supervision services include:</li>
</ol>
<p>&nbsp;</p>
<ul>
<li>Supervision of the contracted civil works for all the identified investment/activities for the municipality of Gjirokastra;</li>
<li>Monitoring, inspection, and reporting supervision activities.</li>
</ul>
<p>&nbsp;</p>
<p>The Consultant will carry out the following main activities for supervision services:</p>
<p>&nbsp;</p>
<ul>
<li><u>Activity 1</u><em>:</em> Inception Phase</li>
<li><u>Activity 2:</u> Construction Phase</li>
<li><u>Activity 3:</u> Defects Liability Period</li>
</ul>
<p>&nbsp;</p>
<p><strong>Detail Design Phase: </strong>A multi-disciplinary team of <strong><u>8 key staff</u></strong> professional and technical personal will be required for the execution of the project.  The Consultant Team should be led for the full term of the project by a Principal Architect as the Team Leader with international experience in developing similar projects to the scope of this consultancy and background in Museography and interventions in Cultural Heritage sites (preferably in WHS) and Project Management. A local Architect/Urban Planner with knowledge of local language should be mobilized fully for the duration of the consultancy to serve as local liaison. The Team Leader and Architect/Urban Planner (of the local liaison) should make a minimum of field visits to the project areas each as part of the development of design services, which will be reflected in the work plan and be subject of evaluation process. Indeed, their presence is considered obligatory as part of the deliverables in the stakeholder workshop, this do not limit the presence of the other team members as valued important by the Consultant, in consultation with the Client.</p>
<p>&nbsp;</p>
<p>The key team composition for the Detail Design phase shall be as below:</p>
<p>&nbsp;</p>
<ul>
<li><strong>Team Leader &#8211; </strong><strong>Architect </strong><strong>(Core Team International)</strong> &#8211; M.Sc. in Architecture or equivalent with postgraduate qualifications/experience in Museography or similar,</li>
</ul>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>with 15 (fifteen) yrs. international postgraduate experience in project design related to  Architecture Design;</p>
<ul>
<li><strong>Tourism Expert-(Core Team International)</strong> &#8211; Educated to degree level in relevant field, with at least 15 years relevant experience in developing products for the international cultural tourism market, with previous experiences in museums;</li>
<li><strong>Architect/Urban Designer (Core Team, Local or Internatonal</strong>)- M.Sc. in Architecture/Urban design, with postgraduate qualifications or experience in Conservation/Restoration of Build Heritage, with 10 (ten) years of postgraduate exp. in designing projects related to Architecture and Urban Design;</li>
<li><strong>Civil Engineer </strong><strong>(Core Team Local)</strong> &#8211; M.Sc. in Civil Engineering, with 15 (fifteen) yrs. postgraduate exp. in designing projects in civil engineering, with relevant experience in projects similar to the scope of this consultancy;</li>
<li><strong>Exhibition Designer/Curator (Core Team Local or International)</strong> &#8211; MA in Visual Arts and Curatorial Studies or similar post graduations and qualifications in Visual and Performing Arts, Arts management, with 10 (ten) yrs. of postgraduate experience as a curator of museums, exhibitions and similar to the scope of this consultancies;</li>
<li><strong>Topographic Engineer (Local team)</strong> &#8211; Sc. in Topographic Engineering, with 8 (eight) yrs. postgraduate experience in topographic surveys and GIS Expertise;</li>
<li><strong>Environmental Specialist (Local team)</strong> &#8211; With relevant postgraduate qualifications in the relevant field. Certified for Environmental Impact Assessment (EIA), from the National Licensing Center for EIA, National Registration Center extract;</li>
<li><strong>Business Plan Expert (Local team)</strong> – Educated to degree level in Economics, Business Administration or relevant field, with 3 (three) yrs. postgraduate experience in business planning and preparation of business plans;</li>
</ul>
<p>&nbsp;</p>
<p>In addition to the above, the following qualifications are expected to be needed for the development of the assignment: <strong>Property evaluation Specialist/Expert,</strong> electrical/electronic engineer, mechanical engineer (HVAC systems, etc.), historian, procurement specialist, quantity surveyor, a local cultural heritage expert with relevant license issued by the Ministry of Culture.</p>
<p><strong> </strong></p>
<p><strong>Supervision phase</strong>: The Consultant shall provide an experienced construction supervision and contract administration team of <strong><u>6 key staff</u></strong> with proven technical and managerial competence and experience in the supervision of construction works under World Bank Conditions of Contractor, Albanian Legislation and internationally recognized contract conditions used by IFI&#8217;s. It is the responsibility of the Consultant to make sure that there is continuity between Phase A and Phase B and they have to ensure that the supervision team will include the Architect/Urban Designer/Urban Planner Local and the Exhibition designer /Curator among the key staff from the design team, which are fully familiar with the project and designs and will assure consistency between the two phases.</p>
<p>&nbsp;</p>
<p>The key team composition for the supervision phase shall be as below:</p>
<p>&nbsp;</p>
<ul>
<li><strong>Team Leader (Key staff 1/International)</strong>&#8211; He/she shall have at least a Master (3+2) or equivalent University Degree in Civil Engineering/Architecture, with 15 (fifteen) yrs. postgraduate exp. in projects of Architect/Urban Planning &amp; Project Management,</li>
</ul>
<p>&nbsp;</p>
<p>design project of buildings/infrastructure rehabilitation and  interior design projects and relevant to the scope of this consultancy;</p>
<ul>
<li><strong>Site Supervision Engineer (Key staff 2)</strong> &#8211; He/she shall have at least a Master (3+2) or equivalent University Degree in Civil Engineering, with 10 (ten) years in design/supervision/construction in projects relevant to the scope of this consultancy;</li>
<li><strong>Material Engineer (Key staff 3)</strong>&#8211; He/she shall have at least a Master (3+2) or equivalent University Degree in Civil Engineering, with 10 (ten) years of material engineer experience in design/supervision/ construction projects;</li>
<li><strong>Environmental and Occupational Health and Safety Specialist (Key staff 4)</strong>&#8211; University Degree in Environmental Engineering, Environmental Science, Natural Resource Management or equivalent, with 5 (five) years’ experience on environmental engineering. Extra qualifications in social aspects are a plus;</li>
<li><strong>Architect/ Urban Designer (Key staff 5) /</strong><strong>From the Design Team</strong> &#8211; M.Sc. in Architecture/Urban Planning, with postgraduate qualifications or experience in Conservation/Restoration of Build Heritage, with 10 (ten) years of postgraduate exp. in designing projects related to Architecture and Urban Design;</li>
<li><strong>Exhibition Designer/Curator (Core Team Local or International) (Key staff 6) / From the Design Team</strong> &#8211; MA in Visual Arts and Curatorial Studies or similar post graduations and qualifications in Visual and Performing Arts, Arts management, with 10 (ten) yrs. of postgraduate experience as a curator of museums, exhibitions and similar to the scope of this consultancies;</li>
<li><strong>Short &#8211; term expert international* </strong>&#8211; Senior expert shall have, university diploma relevant to the proposed field, with a minimum of ten (10) years professional experience relevant to the scope of the work to be undertaken;</li>
</ul>
<p>&nbsp;</p>
<p>*Short – term expert will be engaged to support the team to cover specific tasks of the assignment when expertise is needed and requested by the Client, upon instruction and approval by the Client.  (for a provisional equivalent of 1 man-months). Expert’s CVs will be reviewed by ADF at the time of requirement.</p>
<p>&nbsp;</p>
<p>The short listing criteria are:</p>
<p>&nbsp;</p>
<table>
<tbody>
<tr>
<td width="38"><strong>No.</strong></td>
<td colspan="2" width="529"><strong>Evaluation Criterion</strong></td>
<td width="85"><strong>Points</strong></td>
</tr>
<tr>
<td width="38">1.</td>
<td colspan="2" width="529">Overall experience of the firm (number of years) in the field of assignment</td>
<td width="85">25 points</td>
</tr>
<tr>
<td width="38">2.</td>
<td colspan="2" width="529">Number of similar assignments completed during last 5 (five) years</td>
<td width="85">15 points</td>
</tr>
<tr>
<td width="38">3.</td>
<td colspan="2" width="529">Assignment-relevant experience and qualification of key personnel</td>
<td width="85">50 points</td>
</tr>
<tr>
<td width="38">4.</td>
<td colspan="2" width="529">Number of years of the key personnel in the firm</td>
<td width="85">10 points</td>
</tr>
<tr>
<td colspan="2" width="548"><strong>TOTAL</strong></td>
<td colspan="2" width="104"><strong>100 points</strong></td>
</tr>
<tr>
<td width="38"></td>
<td width="510"></td>
<td width="19"></td>
<td width="85"></td>
</tr>
</tbody>
</table>
<p>&nbsp;</p>
<p>The attention of interested Consultants is drawn to paragraph 1.9 of the World Bank’s <a href="http://www.worldbank.org/html/opr/consult/contents.html"><em>Guidelines: Selection and Employment of Consultants by World Bank Borrowers</em></a> (January 2011, revised July 2014), setting forth the World Bank’s policy on conflict of interest.</p>
<p>&nbsp;</p>
<p>The consultant should be a Firm. The selection method to be applied is <strong>Consultant Qualifications</strong> (<strong>CQ), </strong>in accordance with the procedures set out by the World Bank’s</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<p>“<em>Guidelines Selection and Employment of Consultants under IBRD Loans and IDA Credits &amp; Grants by World Bank Borrowers</em>” (January 2011, revised July 2014)”.</p>
<p>&nbsp;</p>
<p>Design Services should be performed within <strong><em>9 months</em></strong> period, and the level of inputs required is <strong><em>25 man/months</em>.</strong> <strong>The firm will be contracted for the design phase under a lump sum contract</strong>.</p>
<p>&nbsp;</p>
<p>Supervision Services should be performed within <strong><em>13 months period</em></strong>, and the level of inputs required is <strong><em>21 man/months</em></strong>. <strong>The firm will be contracted for the supervision phase under a time base contract</strong>.</p>
<p>&nbsp;</p>
<p>Further information can be obtained at the address below during office hours 08:00 to 16:30 (Monday to Thursday) and 08:00 to 14:00 on Friday.</p>
<p>&nbsp;</p>
<p>Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by fax, or by e-mail) by <strong>October 02, 2018.</strong></p>
<p><strong> </strong></p>
<p><strong>Albanian Development Fund (ADF)</strong></p>
<p><strong>Project for Integrated Urban and Tourism Development (PIUTD)</strong></p>
<p><strong>Address: Rruga ”Sami Frashëri”, Nr. 10, Tirana</strong></p>
<p><strong>Tel/Fax: </strong><strong>+355 4 2235 597/8; +355 4 2234 885</strong></p>
<p><strong>Att: Mr. Erik Qirjaqi</strong></p>
<p><strong>Att: Mr. Artur Zaja</strong></p>
<p><strong>E-mail: </strong><a href="mailto:eqirjaqi@albaniandf.org"><strong>eqirjaqi@albaniandf.org</strong></a></p>
<p><strong>E-mail: </strong><a href="mailto:azaja@albaniandf.org"><strong>azaja</strong><strong>@albaniandf.org</strong></a></p>
<p><a href="https://www.albaniandf.org/en/"><strong>https://www.albaniandf.org</strong></a></p>
<p>&nbsp;</p><p>The post <a href="https://www.albaniandf.org/en/2018/09/10/design-and-supervision-gjirokastra-system-of-museums-municipality-of-gjirokastra-consulting-services/">Design and Supervision Gjirokastra System of Museums-Municipality of Gjirokastra”, Consulting Services</a> appeared first on <a href="https://www.albaniandf.org/en/">Fondi Shqiptar i Zhvillimit</a>.</p>
]]></content:encoded>
					
					<wfw:commentrss>https://www.albaniandf.org/en/2018/09/10/design-and-supervision-gjirokastra-system-of-museums-municipality-of-gjirokastra-consulting-services/feed/</wfw:commentrss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>“Primary Data Collection, Development of Mid-Term and End Follow up Surveys, Assessment of PDO findings achievement in the framework of PIUTD”</title>
		<link>https://www.albaniandf.org/en/2018/07/23/primary-data-collection-development-of-mid-term-and-end-follow-up-surveys/</link>
					<comments>https://www.albaniandf.org/en/2018/07/23/primary-data-collection-development-of-mid-term-and-end-follow-up-surveys/#respond</comments>
		
		<dc:creator><![CDATA[admin-admin]]></dc:creator>
		<pubdate>Mon, 23 Jul 2018 09:55:01 +0000</pubdate>
				<category><![CDATA[Prokurime]]></category>
		<category><![CDATA[Shërbime]]></category>
		<category><![CDATA[PIUTD]]></category>
		<guid ispermalink="false">https://www.albaniandf.org//?p=3126</guid>

					<description><![CDATA[<p>NOTIFICATION FOR SHORTLIST ESTABLISHED Project name: Project for Integrated Urban and Tourism Development (PIUTD) Assignment title: “Primary Data Collection, Development of Mid-Term and End Follow up Surveys, Assessment of PDO...</p>
<p>The post <a href="https://www.albaniandf.org/en/2018/07/23/primary-data-collection-development-of-mid-term-and-end-follow-up-surveys/">“Primary Data Collection, Development of Mid-Term and End Follow up Surveys, Assessment of PDO findings achievement in the framework of PIUTD”</a> appeared first on <a href="https://www.albaniandf.org/en/">Fondi Shqiptar i Zhvillimit</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>NOTIFICATION FOR SHORTLIST ESTABLISHED </strong></p>
<p>Project name: <strong>Project for Integrated Urban and Tourism Development (PIUTD)</strong></p>
<p>Assignment title<strong>: “</strong><strong>Primary Data Collection, Development of Mid-Term and End Follow up Surveys, Assessment of PDO findings achievement in the framework of PIUTD”</strong></p>
<p>Reference No. <strong>REF No: </strong><strong>AL-ADF-62578-CS-CQS</strong></p>
<p>Method of Procurement: <strong>CQS</strong></p>
<p>The consultants that have submitted their Expression of Interest are as below:</p>
<p>&nbsp;</p>
<table width="640" class="mtr-table mtr-tr-td">
<tbody>
<tr>
<td width="46" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content"><strong>No.</strong></div></td>
<td width="206" data-mtr-content="Name of Consultant" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Name of Consultant</strong></div></td>
<td width="128" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Country</strong></div></td>
<td width="260" data-mtr-content="Type of associations between firms" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Type of associations between firms</strong></div></td>
</tr>
<tr>
<td width="46" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">1.</div></td>
<td width="206" data-mtr-content="Name of Consultant" class="mtr-td-tag"><div class="mtr-cell-content">“Abkons” sh.p.k</div></td>
<td width="128" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Albania</div></td>
<td width="260" data-mtr-content="Type of associations between firms" class="mtr-td-tag"><div class="mtr-cell-content">Single Entity</div></td>
</tr>
<tr>
<td width="46" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">2.</div></td>
<td width="206" data-mtr-content="Name of Consultant" class="mtr-td-tag"><div class="mtr-cell-content">“Institute for Democracy and Meditation”(IDM)</div></td>
<td width="128" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Albania</div></td>
<td width="260" data-mtr-content="Type of associations between firms" class="mtr-td-tag"><div class="mtr-cell-content">Single Entity</div></td>
</tr>
<tr>
<td width="46" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">3.</div></td>
<td width="206" data-mtr-content="Name of Consultant" class="mtr-td-tag"><div class="mtr-cell-content">Urban Research Institute” (URI)</div></td>
<td width="128" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Albania</div></td>
<td width="260" data-mtr-content="Type of associations between firms" class="mtr-td-tag"><div class="mtr-cell-content">Single Entity</div></td>
</tr>
<tr>
<td width="46" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">4.</div></td>
<td width="206" data-mtr-content="Name of Consultant" class="mtr-td-tag"><div class="mtr-cell-content">“Albanian Center for Economic Research” (ACER)</div></td>
<td width="128" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Albania</div></td>
<td width="260" data-mtr-content="Type of associations between firms" class="mtr-td-tag"><div class="mtr-cell-content">Single Entity</div></td>
</tr>
<tr>
<td width="46" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">5.</div></td>
<td width="206" data-mtr-content="Name of Consultant" class="mtr-td-tag"><div class="mtr-cell-content">Consortium “Lattanzio Monitoring” &amp; “Evaluation” s.r.l. &amp; ”Horwath HTL”</div></td>
<td width="128" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Italy/Italy/Croatia</div></td>
<td width="260" data-mtr-content="Type of associations between firms" class="mtr-td-tag"><div class="mtr-cell-content">JV</div></td>
</tr>
<tr>
<td width="46" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">6.</div></td>
<td width="206" data-mtr-content="Name of Consultant" class="mtr-td-tag"><div class="mtr-cell-content">“IDRA Research &amp; Consulting”</div></td>
<td width="128" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Albania</div></td>
<td width="260" data-mtr-content="Type of associations between firms" class="mtr-td-tag"><div class="mtr-cell-content">Single Entity</div></td>
</tr>
<tr>
<td width="46" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">7.</div></td>
<td width="206" data-mtr-content="Name of Consultant" class="mtr-td-tag"><div class="mtr-cell-content">JV “EUNACAL Institute” &amp; “Albania Social Services Association” (ASSA)</div></td>
<td width="128" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Albania</div></td>
<td width="260" data-mtr-content="Type of associations between firms" class="mtr-td-tag"><div class="mtr-cell-content">JV</div></td>
</tr>
</tbody>
</table>
<p>&nbsp;</p>
<p>The final ranking of consultants is as follow:</p>
<p>&nbsp;</p>
<table width="636" class="mtr-table mtr-tr-td">
<tbody>
<tr>
<td width="48" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content"><strong>No.</strong></div></td>
<td width="282" data-mtr-content=" Consultant’s name " class="mtr-td-tag"><div class="mtr-cell-content"><strong> </strong>
<p><strong>Consultant’s name</strong></p>
<p><strong> </strong></p></div></td>
<td width="138" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Country</strong></div></td>
<td width="72" data-mtr-content="Points" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Points</strong></div></td>
<td width="96" data-mtr-content="Ranking" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Ranking</strong></div></td>
</tr>
<tr>
<td width="48" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">1.</div></td>
<td width="282" data-mtr-content=" Consultant’s name " class="mtr-td-tag"><div class="mtr-cell-content">“Albanian Center for Economic Research” (ACER)</div></td>
<td width="138" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Albania</div></td>
<td width="72" data-mtr-content="Points" class="mtr-td-tag"><div class="mtr-cell-content">98,67</div></td>
<td width="96" data-mtr-content="Ranking" class="mtr-td-tag"><div class="mtr-cell-content">1</div></td>
</tr>
<tr>
<td width="48" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">2.</div></td>
<td width="282" data-mtr-content=" Consultant’s name " class="mtr-td-tag"><div class="mtr-cell-content">“IDRA Research &amp; Consulting”</div></td>
<td width="138" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Albania</div></td>
<td width="72" data-mtr-content="Points" class="mtr-td-tag"><div class="mtr-cell-content">96,33</div></td>
<td width="96" data-mtr-content="Ranking" class="mtr-td-tag"><div class="mtr-cell-content">2</div></td>
</tr>
<tr>
<td width="48" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">3.</div></td>
<td width="282" data-mtr-content=" Consultant’s name " class="mtr-td-tag"><div class="mtr-cell-content">Consortium “Lattanzio Monitoring” &amp; “Evaluation” s.r.l. &amp; ”Horwath HTL”</div></td>
<td width="138" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Italy/Italy/Croatia</div></td>
<td width="72" data-mtr-content="Points" class="mtr-td-tag"><div class="mtr-cell-content">88</div></td>
<td width="96" data-mtr-content="Ranking" class="mtr-td-tag"><div class="mtr-cell-content">3</div></td>
</tr>
<tr>
<td width="48" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">4.</div></td>
<td width="282" data-mtr-content=" Consultant’s name " class="mtr-td-tag"><div class="mtr-cell-content">“Institute for Democracy and Meditation”(IDM)</div></td>
<td width="138" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Albania</div></td>
<td width="72" data-mtr-content="Points" class="mtr-td-tag"><div class="mtr-cell-content">78,33</div></td>
<td width="96" data-mtr-content="Ranking" class="mtr-td-tag"><div class="mtr-cell-content">4</div></td>
</tr>
<tr>
<td width="48" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">5.</div></td>
<td width="282" data-mtr-content=" Consultant’s name " class="mtr-td-tag"><div class="mtr-cell-content">Urban Research Institute” (URI)</div></td>
<td width="138" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Albania</div></td>
<td width="72" data-mtr-content="Points" class="mtr-td-tag"><div class="mtr-cell-content">74,33</div></td>
<td width="96" data-mtr-content="Ranking" class="mtr-td-tag"><div class="mtr-cell-content">5</div></td>
</tr>
<tr>
<td width="48" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">6.</div></td>
<td width="282" data-mtr-content=" Consultant’s name " class="mtr-td-tag"><div class="mtr-cell-content">“Abkons” sh.p.k</div></td>
<td width="138" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Albania</div></td>
<td width="72" data-mtr-content="Points" class="mtr-td-tag"><div class="mtr-cell-content">66</div></td>
<td width="96" data-mtr-content="Ranking" class="mtr-td-tag"><div class="mtr-cell-content">6</div></td>
</tr>
<tr>
<td width="48" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">7.</div></td>
<td width="282" data-mtr-content=" Consultant’s name " class="mtr-td-tag"><div class="mtr-cell-content">JV. “EUNACAL Institute” &amp; “Albania Social Services Association” (ASSA)</div></td>
<td width="138" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Albania</div></td>
<td width="72" data-mtr-content="Points" class="mtr-td-tag"><div class="mtr-cell-content">30</div></td>
<td width="96" data-mtr-content="Ranking" class="mtr-td-tag"><div class="mtr-cell-content">7</div></td>
</tr>
</tbody>
</table>
<p>&nbsp;</p>
<p>Awarded consultant: <strong>Albanian Center for Economic Research</strong></p>
<p>Contract value:<strong> 84,672 Euro </strong><strong>(including all indirect taxes)</strong></p><p>The post <a href="https://www.albaniandf.org/en/2018/07/23/primary-data-collection-development-of-mid-term-and-end-follow-up-surveys/">“Primary Data Collection, Development of Mid-Term and End Follow up Surveys, Assessment of PDO findings achievement in the framework of PIUTD”</a> appeared first on <a href="https://www.albaniandf.org/en/">Fondi Shqiptar i Zhvillimit</a>.</p>
]]></content:encoded>
					
					<wfw:commentrss>https://www.albaniandf.org/en/2018/07/23/primary-data-collection-development-of-mid-term-and-end-follow-up-surveys/feed/</wfw:commentrss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Municipalities of Berati and Përmeti -Concept, Detail Designs and Supervision for Integrated Urban Upgrading</title>
		<link>https://www.albaniandf.org/en/2018/06/13/contract-award-notice-municipalities-berati-permeti/</link>
					<comments>https://www.albaniandf.org/en/2018/06/13/contract-award-notice-municipalities-berati-permeti/#respond</comments>
		
		<dc:creator><![CDATA[admin-admin]]></dc:creator>
		<pubdate>Wed, 13 Jun 2018 17:45:34 +0000</pubdate>
				<category><![CDATA[Prokurime]]></category>
		<category><![CDATA[Tenderat Fitues]]></category>
		<category><![CDATA[PIUTD]]></category>
		<guid ispermalink="false">https://www.albaniandf.org/?p=2512</guid>

					<description><![CDATA[<p>CONTRACT AWARD NOTICE   Reference code Contract No: RFP No.: AL-ADF-31055-CS-QCBS Country: Albania Sector: Tourism Development Project Title: Project for Integrated Urban and Tourism Development -PIUTD Assignment Title: “Municipalities of...</p>
<p>The post <a href="https://www.albaniandf.org/en/2018/06/13/contract-award-notice-municipalities-berati-permeti/">Municipalities of Berati and Përmeti -Concept, Detail Designs and Supervision for Integrated Urban Upgrading</a> appeared first on <a href="https://www.albaniandf.org/en/">Fondi Shqiptar i Zhvillimit</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><strong>CONTRACT AWARD NOTICE</strong></p>
<p><strong> </strong></p>
<ol start="1">
<li><strong>Reference code</strong></li>
<li>Contract No:<strong> RFP No.: AL-ADF-31055-CS-QCBS</strong></li>
<li><strong> Country:</strong> Albania</li>
<li><strong>Sector: </strong>Tourism Development</li>
<li><strong>Project Title:</strong> Project for Integrated Urban and Tourism Development -PIUTD</li>
<li><strong> Assignment Title:</strong> <strong>“Municipalities of Berati and Përmeti -Concept, Detail Designs and Supervision for Integrated Urban Upgrading”</strong></li>
<li><strong>Executing Agency:</strong> Albanian Development Fund</li>
<li><strong>Publication date of the procurement notice: </strong>05 October 2017</li>
<li><strong>Number of tenders that has submitted Expression of Interest: </strong>29</li>
</ol>
<p>&nbsp;</p>
<table class="mtr-table mtr-tr-td">
<tbody>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">No.</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">Name of the Consulting firms</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Country</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">1</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">JV Institut  IGH d.d. &amp; Urban Planning Institute of Croatia (UH) d.o.o&amp; Taulant  ltd</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Croatia/Croatia/Albania</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">2</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">Association Ateleir 4 &amp; Keios</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Albania/Italy</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">3</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">JV. Thymio Papayannis and Associates S.A.(TPA) ” &amp;”Arkonstudio” ltd &amp; “Erald- G” ltd</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Greece/Albania/Albania</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">4</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">JV. “ABDR Architteti Associati”&amp;”MetroPolis” ltd</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Italy/Albania</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">5</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">JV.” Arep Ville” &amp; “Suez Consulting” &amp; “Dea Studio” ltd</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">France/France/Albania</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">6</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">JV. “Open Plan Consulting” s.r.l &amp; “Planarch” s.r.l. &amp; “Illyrian Consulting Engineers (ICE)”ltd</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Italy/Italy/Albania</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">7</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">JV. “Hydea” spa &amp; “UTS-01” ltd</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Italy/Albania</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">8</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">Consortium “Arriola &amp; Fiol Arquitectes”&amp;”Studio B&amp;L” ltd&amp; “IC Consulten”ltd</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Spain/Albania/Albania</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">9</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">JV “Iproplan@Planungsgesellschaft” &amp; “Plan-Consult” ltd</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Germany/ Albania</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">10</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">Association  “XDGA- Xaveer De Geyter Architects”, Belgium &amp;”  Symbiotica ”Albania &amp; Germany&amp;”Infrakonsult ” Albania and “Sweco” GmbH/Germany as sub-consultant and individualfor cultural heritage  expertise</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Belgium &amp; Albania/Germany</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">11</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">JV.  “Bernard Ingenieure ZT” GmbH&amp; “Austria Rail Enginering(ARE)” GmbH&amp;”G+A Projekt” sh.p.k</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Austria/Austria/Albania</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">12</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">JV. “Studio Architettura Graziano Borghi”&amp;”CEC Group” ltd &amp; “AI.ERRE Engineering” s.r.l &amp; “Mafin Green Power” s.r.l &amp; “Sinnergie Soc. Cons.a.r.l.” &amp; “Mobility in Chain (MIC) &amp; &amp; &amp;Mobility in Chain</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Italy/Albania /Italy/Italy/Italy</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">13</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">JV.”Ingegneri  Riuniti” spa&amp;”Rossi Prodi Associat” i &amp;“Weissgerber &amp; Partners”ltd</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Italy/Italy/Albania</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">14</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">JV. “MBM arquitects” &amp; “S.M.N. Studio di Architettura G.L. Sylos Labini e Partners S.S.T.P.”</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Spain/Italy</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">15</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">“Anaplasi Consulting Engineers” s.a. &amp; “Local Partner Edi Como Studio”</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Greece /Albania</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">16</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">JV. “3TI Proggeti” s.p.a. &amp; “ARS Progetti” s.p.a. &amp; “Geosat Group” sh.p.k.</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Italy/Italy/Albania</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">17</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">JV. “Ambiente”s.c &amp;” Sferastudio”ltd &amp;“Baukuh”&amp; FM Ingenieria”</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Italy/Albania/Italy/Italy</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">18</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">JV. “C+S Associati s.r.l” &amp; “SON Engineering &amp; Construction” &amp; “Instituti I Politikave Private (IP3)”</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Italy/Albania/Albania</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">19</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">“JV.Abkons ltd&amp; “Arub Italia”srl</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Albania/Italy</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">20</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">“Gaia S.A.  Meleton</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Greece</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">21</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">JV. “Bolles &amp; Willson” GmbH &amp; “Studio Schultz Granberg” GmbH &amp; “Kemming Landschaftsarchitektur” &amp;”Thomas&amp;Boekamp IngenierurgesellschaftmbH” &amp;”Giovanni Damiani”&amp;
<p>“Job Project” ltd</p></div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Germany/Germany/Germany/ Italy/Albania</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">22</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">JV.”Republic Institute for Urban Planning and Design” jsc &amp;”Horwarth HTL”&amp;”4 A-M” ltd</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Montenegro/Croatia /Albania</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">23</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">“Gjekonsult &amp; Co”</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Albania</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">24</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">JV. “Studio 3piu1 Architetti Associati”&amp;OOcra” srl &amp;”Studio Archimed” sh.p.k.</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Italy/Italy/Albania</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">25</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">“A &amp; E Enginering”</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Albania</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">26</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">JV. “Societa Italiana di Monitoraggio/ SIM”  s.p.a&amp;”SUT”srl</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Italy/Italy</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">27</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">Association “Rogan Associates S.A &amp; Betaplan S.A &amp; Derbi-E l.t.d”</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Greece/Greece/Albania</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">28</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">“Oikonomou &amp; Associates”</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Greece</div></td>
</tr>
<tr>
<td width="52" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">29</div></td>
<td width="397" data-mtr-content="Name of the Consulting firms" class="mtr-td-tag"><div class="mtr-cell-content">Consorzio “Caire”</div></td>
<td width="182" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Italy</div></td>
</tr>
</tbody>
</table>
<p>&nbsp;</p>
<ol start="10">
<li><strong> Number of tender that has been shortlisted: </strong>6</li>
</ol>
<p><strong> </strong></p>
<p>Association “IGH” d.d. &amp; “Urban Planning Institute of Croatia” (UH) d.o.o. &amp; “Taulant” ltd</p>
<p>Horwath HTL &amp; Werner Bilgram</p>
<p>Association “Atelier 4” &amp; “Keios”</p>
<p>Association “Thymio Papayannis and Associates S.A. (TPA)” &amp; “Arkostudio” ltd &amp; “Erald” – G” ltd</p>
<p>Association “ABDR Architteti Associati” &amp; “Metro Polis” ltd</p>
<p>Association “Arep Ville” &amp; “Suez Consulting” &amp; “Dea Studio” ltd</p>
<p>Association “Open Plan Consulting” s.r.l. &amp; “Planarch” s.r.l. &amp; “Illyrian Consulting Engineers (ICE)” ltd</p>
<p><strong> </strong></p>
<ol start="11">
<li><strong> Number of tenders that has submitted Request for Proposal: 6</strong></li>
</ol>
<p>&nbsp;</p>
<p>Association “Atelier 4” &amp; “Keios” – 94.28 points</p>
<p>Association “IGH” d.d. &amp; “Urban Planning Institute of Croatia” (UH) d.o.o. &amp; “Taulant” ltd</p>
<p>Horwath HTL &amp; Werner Bilgram – 88.91 points</p>
<p>Association “Thymio Papayannis and Associates S.A. (TPA)” &amp; “Arkostudio” ltd &amp; “Erald” – G” ltd – 86.10 points</p>
<p>Association “Open Plan Consulting” s.r.l. &amp; “Planarch” s.r.l. &amp; “Illyrian Consulting Engineers (ICE)” ltd – 83.16 points</p>
<p>Association “ABDR Architteti Associati” &amp; “Metro Polis” ltd – 83.12 points</p>
<p>Association “Arep Ville” &amp; “Suez Consulting” &amp; “Dea Studio” ltd – 75.47 points</p>
<p>&nbsp;</p>
<ol start="12">
<li><strong> Financial prices as read out:</strong></li>
</ol>
<p><strong> </strong></p>
<p>Association “Atelier 4” &amp; “Keios” – 950,435 Euro (VAT Excl)</p>
<p>Association “IGH” d.d. &amp; “Urban Planning Institute of Croatia” (UH) d.o.o. &amp; “Taulant” ltd</p>
<p>Horwath HTL &amp; Werner Bilgram – 766,380 Euro (VAT Excl)</p>
<p>Association “Thymio Papayannis and Associates S.A. (TPA)” &amp; “Arkostudio” ltd &amp; “Erald” – G” ltd – 1,074,282.79 Euro (VAT Excl)</p>
<p>Association “Open Plan Consulting” s.r.l. &amp; “Planarch” s.r.l. &amp; “Illyrian Consulting Engineers (ICE)” ltd – 1,160,150 Euro (VAT Excl)</p>
<p>Association “ABDR Architteti Associati” &amp; “Metro Polis” ltd – 958,333 Euro (VAT Excl)</p>
<p>Association “Arep Ville” &amp; “Suez Consulting” &amp; “Dea Studio” ltd – 987,106.57 Euro (VAT Excl)</p>
<p>&nbsp;</p>
<ol start="13">
<li><strong> Financial prices after evaluation </strong></li>
</ol>
<p>&nbsp;</p>
<p>Association “Atelier 4” &amp; “Keios” – 950,435 Euro (VAT Excl)</p>
<p>Association “IGH” d.d. &amp; “Urban Planning Institute of Croatia” (UH) d.o.o. &amp; “Taulant” ltd</p>
<p>Horwath HTL &amp; Werner Bilgram – 766,380 Euro (VAT Excl)</p>
<p>Association “Thymio Papayannis and Associates S.A. (TPA)” &amp; “Arkostudio” ltd &amp; “Erald” – G” ltd – 1,074,282.79 Euro (VAT Excl)</p>
<p>Association “Open Plan Consulting” s.r.l. &amp; “Planarch” s.r.l. &amp; “Illyrian Consulting Engineers (ICE)” ltd – 1,160,150 Euro (VAT Excl)</p>
<p>Association “ABDR Architteti Associati” &amp; “Metro Polis” ltd – 958,333 Euro (VAT Excl)</p>
<p>Association “Arep Ville” &amp; “Suez Consulting” &amp; “Dea Studio” ltd – 987,106.57 Euro (VAT Excl)</p>
<p>&nbsp;</p>
<ol start="14">
<li><strong> The final combined score</strong></li>
</ol>
<p>&nbsp;</p>
<table width="726">
<tbody>
<tr>
<td width="144"><strong> </strong></td>
<td colspan="3" width="258"><strong>Technical<br />
Evaluation</strong></td>
<td colspan="2" width="168"><strong>Financial<br />
Evaluation</strong></td>
<td colspan="2" width="156"><strong>Combined Evaluation</strong></td>
</tr>
<tr>
<td width="144"><strong>Consultants’ names</strong></td>
<td width="84"><strong>Technical<br />
scores<br />
S(t)</strong></td>
<td width="96"><strong>Weighted<br />
scores<br />
S(t) </strong><strong>´</strong><strong> T</strong></td>
<td width="78"><strong><br />
Technical<br />
rank</strong></td>
<td width="84"><strong>Financial<br />
scores<br />
S(f)</strong></td>
<td width="84"><strong>Weighted<br />
scores<br />
S(f) </strong><strong>´</strong><strong> F</strong></td>
<td width="102"><strong><br />
Scores<br />
S(t) T + S(f) F</strong></td>
<td width="54">&nbsp;</p>
<p>Rank</td>
</tr>
<tr>
<td width="144">Association “Atelier 4” &amp; “Keios”</td>
<td width="84"><strong>94.28</strong></td>
<td width="96"><strong>75.42</strong></td>
<td width="78"><strong>1</strong></td>
<td width="84"><strong>80.63</strong></td>
<td width="84"><strong>16.13</strong></td>
<td width="102"><strong>91.55</strong></td>
<td width="54"><strong>1</strong></td>
</tr>
<tr>
<td width="144">Association “IGH” d.d. &amp; “Urban Planning Institute of Croatia” (UH) d.o.o. &amp; “Taulant” ltd</p>
<p>Horwath HTL &amp; Werner Bilgram</td>
<td width="84"><strong>88.91</strong></td>
<td width="96"><strong>71.13</strong></td>
<td width="78"><strong>2</strong></td>
<td width="84"><strong>100</strong></td>
<td width="84"><strong>20.00</strong></td>
<td width="102"><strong>91.13</strong></td>
<td width="54"><strong>2</strong></td>
</tr>
<tr>
<td width="144">Association “Thymio Papayannis and Associates S.A. (TPA)” &amp; “Arkostudio” ltd &amp; “Erald” – G” ltd</td>
<td width="84"><strong>86.1</strong></td>
<td width="96"><strong>68.88</strong></td>
<td width="78"><strong>3</strong></td>
<td width="84"><strong>71.34</strong></td>
<td width="84"><strong>14.27</strong></td>
<td width="102"><strong>83.15</strong></td>
<td width="54"><strong>3</strong></td>
</tr>
<tr>
<td width="144">Association “ABDR Architteti Associati” &amp; “Metro Polis” ltd</td>
<td width="84"><strong>83.12</strong></td>
<td width="96"><strong>66.50</strong></td>
<td width="78"><strong>5</strong></td>
<td width="84"><strong>79.97</strong></td>
<td width="84"><strong>15.99</strong></td>
<td width="102"><strong>82.49</strong></td>
<td width="54"><strong>4</strong></td>
</tr>
<tr>
<td width="144">Association “Open Plan Consulting” s.r.l. &amp; “Planarch” s.r.l. &amp; “Illyrian Consulting Engineers (ICE)” ltd</td>
<td width="84"><strong>83.16</strong></td>
<td width="96"><strong>66.53</strong></td>
<td width="78"><strong>4</strong></td>
<td width="84"><strong>66.06 </strong></td>
<td width="84"><strong>13.21</strong></td>
<td width="102"><strong>79.74</strong></td>
<td width="54"><strong>5</strong></td>
</tr>
<tr>
<td width="144">Association “Arep Ville” &amp; “Suez Consulting” &amp; “Dea Studio” ltd</td>
<td width="84"><strong>75.47</strong></td>
<td width="96"><strong>60.38</strong></td>
<td width="78"><strong>6</strong></td>
<td width="84"><strong>77.64</strong></td>
<td width="84"><strong>15.53</strong></td>
<td width="102"><strong>75.90</strong></td>
<td width="54"><strong>6</strong></td>
</tr>
<tr>
<td colspan="8" width="726">To highest combined technical/financial score.<br />
Consultant’s name<strong>: </strong>Association “Atelier 4” (Albania) &amp; “Keios” (Italy)</td>
</tr>
</tbody>
</table>
<p>&nbsp;</p>
<ol start="15">
<li><strong> Financial Offer of the chosen tenderer </strong></li>
</ol>
<p>950,435 (VAT Excl)</p>
<p>&nbsp;</p>
<ol start="16">
<li><strong> Name, address and nationality of the successful tenderer</strong></li>
</ol>
<p>Association “Atelier 4” &amp; “Keios”, Njesia Administrative Nr.5, Rr. “E Kosovareve”, Nd.35, Hyrja 6, Ap. 4/1, Tirana, Albania</p><p>The post <a href="https://www.albaniandf.org/en/2018/06/13/contract-award-notice-municipalities-berati-permeti/">Municipalities of Berati and Përmeti -Concept, Detail Designs and Supervision for Integrated Urban Upgrading</a> appeared first on <a href="https://www.albaniandf.org/en/">Fondi Shqiptar i Zhvillimit</a>.</p>
]]></content:encoded>
					
					<wfw:commentrss>https://www.albaniandf.org/en/2018/06/13/contract-award-notice-municipalities-berati-permeti/feed/</wfw:commentrss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Municipality of Saranda – Detailed Designs and Construction Supervision for Saranda Tourism Gateway Integrated Urban Upgrading</title>
		<link>https://www.albaniandf.org/en/2018/04/13/detailed-designs-and-construction-supervision-for-saranda/</link>
					<comments>https://www.albaniandf.org/en/2018/04/13/detailed-designs-and-construction-supervision-for-saranda/#respond</comments>
		
		<dc:creator><![CDATA[admin-admin]]></dc:creator>
		<pubdate>Fri, 13 Apr 2018 14:35:58 +0000</pubdate>
				<category><![CDATA[Prokurime]]></category>
		<category><![CDATA[Shërbime]]></category>
		<category><![CDATA[PIUTD]]></category>
		<guid ispermalink="false">https://www.albaniandf.org//?p=3004</guid>

					<description><![CDATA[<p>NOTIFICATION FOR SHORTLIST ESTABLISHED  Project name: Project for Integrated Urban and Tourism Development (PIUTD) Assignment title: Municipality of Saranda – Detailed Designs and Construction Supervision for Saranda Tourism Gateway Integrated Urban...</p>
<p>The post <a href="https://www.albaniandf.org/en/2018/04/13/detailed-designs-and-construction-supervision-for-saranda/">Municipality of Saranda – Detailed Designs and Construction Supervision for Saranda Tourism Gateway Integrated Urban Upgrading</a> appeared first on <a href="https://www.albaniandf.org/en/">Fondi Shqiptar i Zhvillimit</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h5>NOTIFICATION FOR SHORTLIST ESTABLISHED <b><br />
</b>Project name: Project for Integrated Urban and Tourism Development (PIUTD)<b></b><b></b></h5>
<p style="font-weight: 400;">Assignment title: <b><strong>Municipality of Saranda – Detailed Designs and Construction Supervision for Saranda Tourism Gateway Integrated Urban Upgrading</strong></b></p>
<p style="font-weight: 400;">Reference No. <b><strong>AL-ADF-44317-CQ-QCBS</strong></b></p>
<p style="font-weight: 400;">Method of Procurement: <b><strong>QCBS</strong></b></p>
<p style="font-weight: 400;">The shortlisted consultants invited to submit their proposal as below:</p>
<table style="height: 891px;" width="716" class="mtr-table mtr-tr-td">
<tbody>
<tr>
<td width="38" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content"><strong>No.</strong></div></td>
<td width="269" data-mtr-content="Name of Consultant" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Name of Consultant</strong></div></td>
<td width="167" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Country</strong></div></td>
<td width="169" data-mtr-content="Type of associations between firms" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Type of associations between firms</strong></div></td>
</tr>
<tr>
<td width="38" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">1.</div></td>
<td width="269" data-mtr-content="Name of Consultant" class="mtr-td-tag"><div class="mtr-cell-content">JV “<strong>P.A.N.G.E.A Societa Cooperative Consortile”</strong> &amp; “TRT Trasporti e Territoria” s.r.l. &amp; “Archest” s.r.l. &amp; “A&amp;I Design” sh.p.k.</div></td>
<td width="167" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Italy</strong>/Italy/Italy/
<p>Albania</p></div></td>
<td width="169" data-mtr-content="Type of associations between firms" class="mtr-td-tag"><div class="mtr-cell-content">Joint Venture</div></td>
</tr>
<tr>
<td width="38" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">2.</div></td>
<td width="269" data-mtr-content="Name of Consultant" class="mtr-td-tag"><div class="mtr-cell-content">JV “<strong>Sweco GmbH”</strong> &amp; “Symbiotica” sh.p.k. &amp; “Mobility in Chain” s.r.l. &amp; “Infrakonsult” sh.p.k. with sub-consultant “Symbiotica” GmbH</div></td>
<td width="167" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Germany</strong>/Albania/Italy/
<p>Albania/Germany</p></div></td>
<td width="169" data-mtr-content="Type of associations between firms" class="mtr-td-tag"><div class="mtr-cell-content">Joint Venture</div></td>
</tr>
<tr>
<td width="38" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">3.</div></td>
<td width="269" data-mtr-content="Name of Consultant" class="mtr-td-tag"><div class="mtr-cell-content">JV “<strong>Arep Ville”</strong> &amp; “Suez Consulting” &amp; “Dea Studio” sh.p.k.</div></td>
<td width="167" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content"><strong>France</strong>/France/Albania</div></td>
<td width="169" data-mtr-content="Type of associations between firms" class="mtr-td-tag"><div class="mtr-cell-content">Joint Venture</div></td>
</tr>
<tr>
<td width="38" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">4.</div></td>
<td width="269" data-mtr-content="Name of Consultant" class="mtr-td-tag"><div class="mtr-cell-content">JV “<strong>Abkons” sh.p.k</strong> &amp;“Arup” s.r.l.</div></td>
<td width="167" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Albania</strong> &amp; Italy</div></td>
<td width="169" data-mtr-content="Type of associations between firms" class="mtr-td-tag"><div class="mtr-cell-content">Joint Venture</div></td>
</tr>
<tr>
<td width="38" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">5.</div></td>
<td width="269" data-mtr-content="Name of Consultant" class="mtr-td-tag"><div class="mtr-cell-content">JV “<strong>Arkonstudio” l.t.d</strong>. &amp; “Dromos Consulting” l.t.d. &amp; “Erald-G” sh.p.k.</div></td>
<td width="167" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Albania</strong>/Greece/
<p>Albania</p></div></td>
<td width="169" data-mtr-content="Type of associations between firms" class="mtr-td-tag"><div class="mtr-cell-content">Joint Venture</div></td>
</tr>
<tr>
<td width="38" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">6.</div></td>
<td width="269" data-mtr-content="Name of Consultant" class="mtr-td-tag"><div class="mtr-cell-content">JV “<strong>ABDR Architetti Associati” s.r.l.</strong> &amp; “Metro Polis” sh.p.k.</div></td>
<td width="167" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content">Italy/Albania</div></td>
<td width="169" data-mtr-content="Type of associations between firms" class="mtr-td-tag"><div class="mtr-cell-content">Joint Venture</div></td>
</tr>
</tbody>
</table>
<p style="font-weight: 400;">The standby* list is as below:</p>
<table style="height: 331px;" width="714" class="mtr-table mtr-tr-td">
<tbody>
<tr>
<td width="38" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content"><strong>No.</strong></div></td>
<td width="269" data-mtr-content="Name of Consultant" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Name of Consultant</strong></div></td>
<td width="162" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Country</strong></div></td>
<td width="174" data-mtr-content="Type of associations between firms" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Type of associations between firms</strong></div></td>
</tr>
<tr>
<td width="38" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">1.</div></td>
<td width="269" data-mtr-content="Name of Consultant" class="mtr-td-tag"><div class="mtr-cell-content">Consortium “<strong>RPA” s.r.l. </strong>&amp;” Atelier 4” ltd</div></td>
<td width="162" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Italy</strong>/Albania</div></td>
<td width="174" data-mtr-content="Type of associations between firms" class="mtr-td-tag"><div class="mtr-cell-content">Consortium</div></td>
</tr>
<tr>
<td width="38" data-mtr-content="No." class="mtr-td-tag"><div class="mtr-cell-content">2.</div></td>
<td width="269" data-mtr-content="Name of Consultant" class="mtr-td-tag"><div class="mtr-cell-content">JV “<strong>C+S Associati”</strong> s.r.l. &amp; “SON Engineering” sh.p.k. &amp; “IP3” &amp; “Infratransproject” sh.p.k.</div></td>
<td width="162" data-mtr-content="Country" class="mtr-td-tag"><div class="mtr-cell-content"><strong>Italy</strong>/Albania/Albania/
<p>Albania</p></div></td>
<td width="174" data-mtr-content="Type of associations between firms" class="mtr-td-tag"><div class="mtr-cell-content">Joint Venture</div></td>
</tr>
</tbody>
</table>
<p style="font-weight: 400;">Note* These companies will substitute any shortlisted firms that may choose not to participate in the selection process</p><p>The post <a href="https://www.albaniandf.org/en/2018/04/13/detailed-designs-and-construction-supervision-for-saranda/">Municipality of Saranda – Detailed Designs and Construction Supervision for Saranda Tourism Gateway Integrated Urban Upgrading</a> appeared first on <a href="https://www.albaniandf.org/en/">Fondi Shqiptar i Zhvillimit</a>.</p>
]]></content:encoded>
					
					<wfw:commentrss>https://www.albaniandf.org/en/2018/04/13/detailed-designs-and-construction-supervision-for-saranda/feed/</wfw:commentrss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>